Collection

Route-wide reports for High Speed Rail (Crewe – Manchester) Environmental Statement

These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe – Manchester on a route-wide basis

These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe – Manchester on a route-wide basis. ‘Volume 3’ of the Environmental Statement describes the likely significant environmental effects that are likely to occur at a geographical scale greater than the community areas described in Volume 2. The accompanying technical appendices (Volume 5) provide details of the studies and surveys undertaken at a route-wide level and are organised by environmental topic areas.

Volume 3: Route-wide effects

This report describes the likely significant environmental effects that are likely to occur at a geographical scale greater than the community areas described in Volume 2.

Volume 5: Climate change

Volume 5: Community

Volume 5: Ecology and biodiversity

Volume 5: Electromagnetic interference

Volume 5: Health

Volume 5: Historic environment

Volume 5: Major accidents and disasters

Volume 5: Sound, noise and vibration

Volume 5: Traffic and transport

Volume 5: Waste and material resources

Volume 5: Water resources and flood risk

Updates to this page

Published 24 January 2022