Consultation outcome

Environmental permitting: standard rules consultation no 18

This consultation has concluded

Detail of outcome

Feedback received

Detail of feedback received

The summary response document sets out:

  • how we ran the consultation
  • the summary of findings
  • the actions we will take

Original consultation

Summary

We want your views on a proposed revision to SR2018 No 9 for specified generators.

This consultation was held on another website.

This consultation ran from
to

Consultation description

We want your views on the proposal to include the option for secondary abatement in this rule set:

  • SR2018 No 9 standard rules Specified Generator, Tranche B low risk, base load operation between 0 - 0.9 MWth (megawatt thermal)

Documents

Updates to this page

Published 23 November 2018
Last updated 24 December 2018 + show all updates
  1. Added the consultation response document and linked to revised standard rules permit.

  2. First published.

Sign up for emails or print this page