Environmental permitting: standard rules consultation no 18
Detail of outcome
Feedback received
Detail of feedback received
The summary response document sets out:
- how we ran the consultation
- the summary of findings
- the actions we will take
Original consultation
Consultation description
We want your views on the proposal to include the option for secondary abatement in this rule set:
- SR2018 No 9 standard rules Specified Generator, Tranche B low risk, base load operation between 0 - 0.9 MWth (megawatt thermal)
Documents
Updates to this page
Last updated 24 December 2018 + show all updates
-
Added the consultation response document and linked to revised standard rules permit.
-
First published.