Closed consultation

Instrument procedures for instrument runway free aerodromes with or without approach control

We are analysing your feedback

Visit this page again soon to download the outcome to this public feedback.

Summary

Plan for instrument approach procedure at UK aerodromes while maintaining acceptable safety levels.

This consultation was held on another website.

This consultation ran from
to

Consultation description

Describes a way forward which will allow wider deployment of instrument approach procedure at UK aerodromes whilst providing continuing assurance regarding acceptable levels of safety and utilising to the greatest extent possible current policy.

Updates to this page

Published 25 October 2013

Sign up for emails or print this page