Future Fens flood risk management
Fens flood risk management baseline report now available.
Phase 1 of the flood risk management work started 3 years ago, to develop a shared understanding of the flood risk challenges in the Great Ouse Fens of Cambridgeshire and Norfolk.
Future activity will build on this baselining work to develop flood management options that can deliver flood and drainage infrastructure needed for future generations.
This work is delivering on key commitments to the Fens as featured in the National Flood and Coastal Erosion Risk Management Strategy (FCERM) published in 2020.
With a third of the Fens currently below sea level, the area has a network of flood protection assets that are owned and managed by different organisations. Much of this infrastructure is nearing the end of its design life and will soon need significant investment. With the increasing effects of climate change, flood infrastructure is key in providing water resources, environmental, navigation and wider amenity services.
Fens flood infrastructure is also important within the Oxford Cambridge arc in enabling some of the fastest growing places in the UK to maximise their economic potential.
The organisations involved in phase 1 either own or are responsible for the area’s flood risk assets. These assets include:
- 138 pumping stations
- 4 sets of sluice gates
- 95 kilometres of coastal defences
- 405 kilometres of river embankments
The baseline report is part of the first of the programme’s 3 main phases. Scenarios have been developed to describe the ‘do nothing’ and ‘do minimum’ approaches for the next 100 years across a huge geography of approximately 300 flood assets. These are owned and operated by more than 40 risk management authorities. In this area, a third of land is currently below sea level and this will double by 2100 with rising sea levels.
Paul Burrows, Environment Agency spokesperson for Future Fens, said:
The Fens is a complex environment that has been heavily engineered over hundreds of years. Understanding how the large systems of assets work together to provide protection from flooding is difficult and being able to articulate this to inform future flood infrastructure choices is even more challenging.
That is why our early focus has been on ‘baselining’ and I am delighted that our collaborative report is now available and that ADA (The Association of Drainage Authorities) are hosting it on their website.
This work showcases the flood infrastructure within the Great Ouse Fens, explores the economics of a do-nothing and do-minimum scenario and gives a high level overview of how current government flood funding policy would play out. It presents the initial asset management and investment challenge ahead.
The next steps are to bring it to life through visualisation tools and develop the scope for the appraisal of the long-term choices for flood protection and resilience as climate change takes hold and society’s wider aspirations for the Fens become clearer.
Rob Wise, the National Farmers Union East Anglia Environment Adviser, said:
The NFU has been pleased to be working with the Environment Agency and other partners on the Future Fens project given the vital national importance of food production in the Fens.
Across the Fens as a whole the food chain is worth over £3 billion and employs 80,000 people. It is crucial that this strategic UK asset and the people who are part of it are protected from future flood risk.
The project has already produced tangible benefits in suggesting new ways to value these assets to maximise government funding, but there are important conversations to be had about filling the remaining funding gaps identified in the report.
Benefits and future funding
To better understand the funding position, the project has looked at the Government’s Partnership Funding policy strategically and also worked with the National Farmers Union to create an improved approach to valuing agricultural land against the traditional method.
Key findings in the report are:
- £17.1 billion worth of benefits from the current flood risk management measures
- a further £5.3 billion of benefits to the local economy over the next 10 years
- £1.8 billion investment needed over the next 100 years to sustain the current standard of service from the existing flood risk management assets
To meet this level of investment there is an additional funding requirement from beneficiaries of flood infrastructure of between £611 million and £946 million, with eligibility between £722 million and £1.1 billion of government Flood Risk Management Grant in Aid funding (NB costs are present value.)
Next phases
The final elements of phase 1 will be to work with others to develop the scope for phase 2. Phase 2 will be a long term adaptive plan for flood infrastructure in the Fens. This will build on the approaches outlined in the national FCERM strategy and appraise the flood infrastructure choices available for decision makers and prospective funders.
What happens in the meantime?
Phase 2 will start to work on a long term plan.
Tactical plans have been developed for the continued management of existing flood assets between now and 2031/32. These plans identify that around £230 million of capital investment is required.
Report availability
A copy of the baseline report and a summary document can be downloaded from the Association of Drainage Authorities website.
Further information
Organisations involved in phase 1 include:
- Anglian Water
- Cambridgeshire County Council
- Downham Market
- Ely Group of Internal Drainage Boards
- Environment Agency
- Middle Level Commissioners
- NFU (National Farmers Union)
- Norfolk County Council
- North Level District IDB (Internal Drainage Board)
- WRC (Water Resources East)
- Water Management Alliance
- WCIDB (Whittlesey Consortium of Internal Drainage Boards)