BEIS Electricity Generation Costs (November 2016)
This report details the methodology, data and assumptions used to generate the levelised cost estimates.
Documents
Details
This report presents levelised costs for electricity generation technologies. A ‘levelised cost’ is the average cost of the lifetime of the plant per MWh of electricity generated. They reflect the cost of building, operating and decommissioning a generic plant for each technology. The report details the methodology, data and assumptions used to generate the levelised cost estimates.
Updates to this page
Published 9 November 2016Last updated 22 May 2019 + show all updates
-
Data tables (Excel version) added.
-
First published.