Notice

Boiler Upgrade Scheme Regulations: approved standards, grant categories and grant levels

Lists of standards, grant categories and grant levels that have been approved for the scheme.

Applies to England and Wales

Documents

Summary of standards

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

These documents list:

Updates to this page

Published 1 April 2022
Last updated 3 December 2024 + show all updates
  1. Updated to list Issue 2 of Microgeneration Installation Standard: MIS 3005-D The Heat Pump Standard (Design).

  2. Added list of grant categories and grant levels approved for the Boiler Upgrade Scheme.

  3. List of standards updated with the approved codes of practice as required by Regulation 4(1)(j).

  4. First published.

Sign up for emails or print this page