Guidance on deck yacht certificate of competency NoE Requirements
Updated 12 March 2024
For All Applications
- Copy of passport, attested by a responsible person
- An attested passport photograph, cropped to 4:3
- College letter or Action Plan
- ENG1 or accepted equivalent
- 4 STCW basic safety training certificates: - Personal Survival Techniques (STCW Code A-VI/1-1) - Fire Prevention and Fire Fighting (STCW Code A-VI/1-2) - Elementary First Aid (STCW Code A-VI/1-3) - Personal Safety & Social Responsibilities (STCW Code A-VI/1-4)
Officer in Charge of a Navigational Watch (OOW) Yachts, less than 3000 GT, Unlimited Area
- Be at least 19 years of age
- Since the age of 16, have obtained a minimum of 36 months’ onboard yacht service. This must include at least 365 days seagoing service on vessels of 15 metres or over in load line length, made up of:
- A minimum of 250 days’ seagoing service and
- 115 days of any combination of the following:
- Seagoing service;
- Stand-by service – A maximum of 14 consecutive days may be counted at one time, but on no occasion may a period of standby service exceed that of the previous voyage;
- Yard service – up to a maximum of 90 days continuously or in separate periods;
- Completion of an MCA Yacht Training Record Book (You may not be required to complete a if you can demonstrate 36 months’ actual seagoing service on vessels of at least 24 metres in load line length)
Master Yachts, less than 500 GT, Unlimited Area
- Hold an MCA OOW yachts, less than 3000 GT, II/1, Certificate of Competency;
- While serving as a OOW Yachts, less than 3000 GT, II/1, have completed a minimum of 12 months’ onboard yacht service as a deck officer, including at least 120 days watchkeeping service, on vessels of 15 metres or over in load line length
Master Yachts, less than 3000 GT, Unlimited Area
- While serving as a OOW yachts, less than 3000 GT, II/1, have completed a minimum of 24 months’ onboard yacht service as a Deck Officer, including at least 240 days watchkeeping service, completed on vessels of 15 metres or over in load line length and include; - 12 months on vessels of 24 metres or over in load line length, or - 6 months on vessels of 500 GT or more