MUNGO, Noble Innovator DRILLING PRODUCER WELL 22/20-A10 - BP Exploration Operating Company Limited - DR/2564/0 - Decision Date 25/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, 44/12a-AAF planned well (renamed 44/12a-A7Z) - Ithaca (NE) E&P Limited - DR/2500/5 - Decision Date 23/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW - 30/02a-AJD05 PLANNED WELL - Shell U.K. Limited - DR/2385/3 - Decision Date 19/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW, PRODUCER WELL 30/02a-AJD03 - Shell U.K. Limited - DR/2386/2 - Decision date 19/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW, WELL 30/02a-AJD02 planned well - Shell U.K. Limited - DR/2382/3 - Decision Date 19/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JACKDAW, PRODUCER WELL 30/02a-AJD06 - Shell U.K. Limited - DR/2384/4 - Decision Date 19/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JUDY EAST FLANK 30/07a-R4 - Chrysaor Petroleum Company U.K. Limited - DR/2556/1 - Decision Date 19/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a- S1U3P1 planned well - BP Exploration Operating Company Limited - DR/2563/0 - Decision Date 06/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL - 204/20a - BP Exploration Operating Company Limited - DR/2311/12 - Decision Date 06/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Judy East Flank 30/07a-R4 - Chrysaor Petroleum Company U.K. Limited - DR/2556/0 - Decision Date 04/06/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

JUDY 30/07a-RK WELL - Chrysaor Petroleum Company U.K. Limited - DR/2522/2 - Decision Date 29/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING INJECTOR WELL 206/08a- S2BU5I3 planned well - BP Exploration Operating Company Limited - DR/2540/1 - Decision Date 27/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING INJECTOR WELL 206/08a- S2BU5I3 planned well - BP Exploration Operating Company Limited - DR/2540/1 - Decision Date 27/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL 204/20a - BP Exploration Operating Company Limited - DR/2311/11 - Decision Date 20/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL 204/20a - BP Exploration Operating Company Limited - DR/2311/10 - Decision Date 19/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SEAGULL, Valaris Gorilla VI DRILLING PRODUCER WELL 22/29c-J4 (JB) - Ithaca (NE) E&P Limited - DR/2456/3 - Decision Date 16/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST, C-Updip -211/13a- 19 - Shell U.K Limited - DR/2555/1 - Decision Date 14/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN PAN North, WELL 211/13a- 16 - Shell U.K Limited - DR/2478/2 - Decision date 14/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PIPER, Piper B Platform, DRILLING PRODUCER WELL 15/17-F - Repsol Resources UK Limited - DR/2552/0 - Decision date 12/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL 204/20a - BP Exploration Operating Company Limited - DR/2311/9 - Decision date 09/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH [pt of MARNOCK-SKUA], Noble Innovator DRILLING PRODUCER WELL 22/24h- 22/24h-MUR CA planned well - BP Exploration Operating Company Limited - DR/2412/8 - Decision date 08/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH, NOBLE INNOVATOR DRILLING 22/24h-MUR SD - BP Exploration Operating Company Limited - DR/2411/6 - Decision date 08/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Abbey, Noble Resilient DRILLING APPRAISAL WELL 47/03i- Abbey 02 planned well - Petrogas North Sea Limited - DR/2494/5 - Decision date 08/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PIPER, WELL 15/17-R9 sidetracking 15/17-B18 - Repsol Resources UK Limited - DR/2523/1 - Decision date 06/05/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST, C-Updip -211/13a- 19 - Shell UK Limited - DR/2555/0 - Decision Date 30/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-ALPA planned well - Equinor UK Limited - DR/2558/0 - Decision Date 29/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-ALPA planned well - Equinor UK Limited - DR/2557/0 - Decision Date 29/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a - AJ planned well - Ithaca (NE) E&P Limited - DR/2528/2 - Decision Date 29/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- Slot 1 planned well - Ithaca (NE) E&P Limited - DR/2532/2 - Decision Date 29/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, 44/12a-AAF planned well - Ithaca (NE) E&P Limited - DR/2500/4 - Decision Date 29/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- Slot 6 planned well - Ithaca (NE) E&P Limited - DR/2533/2 - Decision Date 29/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER - WELL 9/11a-AIPE - Equinor UK Limited - DR/2357/3 - Decision Date 25/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL C48/30 - Hewett CCS Appraisal Well - Bacton CCS Limited - DR/2559/1 - Decision Date 16/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

WELL C48/30 - Hewett CCS Appraisal Well - Bacton CCS Limited - DR/2559/0 - Decision Date 15/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-A42 (AAEPM) - Equinor Limited - DR/2509/2 - Decision date 10/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING PRODUCER WELL 9/11a-A42 (AAEPM) - Equinor UK Limited - DR/2509/1 - Decision Date 07/04/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

PENGUIN EAST C-TRIASSIC WELL, 211/13a-17 - Shell UK Limited - DR/2375/4 - Decision Date 31/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- Slot 6 planned well - Ithaca (NE) E&P Limited - DR/2533/1 - Decision Date 25/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- Slot 1 planned well - Ithaca (NE) E&P Limited - DR/2532/1 - Decision Date 25/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- AJ planned well - Ithaca (NE) E&P Limited - DR/2528/2 - Decision Date 25/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, 44/12a-AAF planned well - Ithaca (NE) E&P Limited - DR/2500/3 - Decision Date 25/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M63 - Enquest Heather Limited - DR/2511/2 - Decision Date 20/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Abbey, Noble Resilient DRILLING APPRAISAL WELL 47/03i- Abbey 02 planned well - Petrogas North Sea Limited - DR/2494/4 - Decision Date 20/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a- CS2BU5P3 planned well - BP Exploration Operating Company Limited - DR/2548/0 - Decision Date 20/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LEMAN [PERENCO][pt. of LEMAN], Leman H Platform [PERENCO], CO2 Injection 49/27 - Perenco UK Limited - DR/2508/2 - Decision date 19/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION, Drilling of WI well 204/20a- IX215 - BP Exploration Operating Company Limited - DR/2410/7 - Decision Date 18/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, 211/12a-M72 - B3 - Enquest Heather Limited - DR/2547/0 - Decision Date 18/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Drilling 21/30f-B21/30f-BE01 planned well at Belinda field - Petrofac Facilities Management Limited - DR/2341/0 - Decision Date 18/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a-A37 (ALIB) - Equinor UK Limited - DR/2510/2 - Decision Date 17/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

ALLIGIN,CAN-ductor Installation and drilling for INJECTOR WELL 204/20a- AIX9302 planned well - BP Exploration Operating Company Limited - DR/2413/7 - Decision Date 17/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a-BS3U3P2 planned well - BP Exploration Operating Company Limited - DR/2498/1 - Decision Date 13/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CULZEAN WELL 22/25a- CIA planned well - TotalEnergies E&P North Sea UK Limited - DR/2487/3 - Decision Date 12/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

BRODGAR, Paul B. Loyd Jnr DRILLING - Chrysaor Production (UK) Limited - DR/2491/2 - Decision Date 05/03/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

VICTORY, Stena Don DRILLING PRODUCER WELL 207/01a- 2017/1a- VICTORY A1 planned well - Shell U.K. Limited - DR/2538/0 - Decision date 27/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Abbey, Noble Resilient DRILLING APPRAISAL WELL 47/03i- Abbey 02 planned well - Petrogas North Sea Limited - DR/2494/3 - Decision date 27/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

LEMAN [PERENCO][pt. of LEMAN], Leman H Platform [PERENCO], CO2 Injection 49/27 - Perenco UK Limited - DR/2508/1 - Decision Date 25/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- Slot 1 planned well - Ithaca (NE) E&P Limited - DR/2532/0 - Decision Date 24/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- Slot 6 planned well - Ithaca (NE) Limited - DR/2533/0 - Decision Date 24/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, WELL 44/12a- AJ planned well - Ithaca (NE) E&P Limited - DR/2528/0 - Decision Date 24/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CULZEAN, WELL 22/25a- CIA planned well - Totalenergies E&P North Sea UK Limited - DR/2487/2 - Decision date 21/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CYGNUS, 44/12a-AAF planned well - Ithaca (NE) E&P Limited - DR/2500/2 - Decision date 21/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MARINER, Mariner PDQ Platform, DRILLING INJECTOR WELL 9/11a-A37 (ALIB) - Equinor UK Limited - DR/2510/1 - Decision date - 21/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH [pt of MARNOCK-SKUA], Noble Innovator DRILLING PRODUCER WELL 22/24h- 22/24h-MUR CA planned well - BP Exploration Operating Company Limited - DR/2412/7 - Decision date 20/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH, NOBLE INNOVATOR DRILLING 22/24h-MUR SD - BP Exploration Operating Company Limited - DR/2411/5 - Decision date 20/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MURLACH [pt of MARNOCK-SKUA], Noble Innovator DRILLING PRODUCER WELL 22/24h- 22/24h-MUR CA planned well - BP Exploration Operating Company Limited - DR/2412/6 - Decision date 11/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Crosgan, Prospector 1 DRILLING APPRAISAL WELL 42/14a- 42/14a-C planned well - ONE-Dyas UK Limited - DR/2485/0 - Decision date 07/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING PRODUCER WELL 206/08a- S2BU5P3 planned well - BP Exploration Operating Company Limited - DR/2518/0 - Decision Date 05/02/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAIR-RIDGE [Part of CLAIR], Clair Ridge Platform, DRILLING INJECTOR WELL 206/08a- S2BU5I3 planned well - BP Exploration Operating Company Limited - DR/2540/0 - Decision Date 30/01/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Streambeacon Exploration Well - Chrysaor Production (U.K.) Limited - DR/2525/0 - Decision Date 29/01/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

SCHIEHALLION FIELD, Glen Lyon FPSO, DRILLING OF PRODUCER WELL 204/20a - BP Exploration Operating Company Limited - DR/2311/8 - Decision Date 28/01/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

MAGNUS, Magnus Platform, DRILLING PRODUCER WELL 211/12a-M63 - Enquest Heather Limited - DR/2511/1 - Decision Date 21/01/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

CLAYMORE, WELL 14/19-C90 (Completion) - Repsol Resources UK Limited - DR/2539/0 - Decision date 16/01/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Abbey, Noble Resilient DRILLING APPRAISAL WELL 47/03i- Abbey 02 planned well - Petrogas North Sea Limited - DR/2494/2 - Decision date 09/01/2025

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email OPRED@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

Deep Drilling Screening Directions – 2025

Updates to this page

Published 13 January 2025
Last updated 26 June 2025 show all updates
  1. new screening direction added

  2. Screening direction added

  3. DR/2386/2 & DR/2385/3 - Uploaded

  4. DR/2556/1 and DR/2384/4 and e DR/2382/3 - uploaded

  5. DR/2563/0 - Uploaded.

  6. DR/2311/12 added.

  7. Uploaded DR/2556/0.

  8. New Deep Drilling Screening Directions added.

  9. New Deep Drilling Screening Direction added.

  10. DR/2311/10 and DR/2311/11 - Uploaded

  11. DR/2456/3 - Uploaded

  12. DR/2555/1 - upload

  13. Upload - DR/2478/2

  14. DR/2552/0 and DR/2311/9 uploaded

  15. DR/2412/8, DR/2411/6 and DR/2494/5 uploaded

  16. DR/2523/1 uploaded

  17. DR/2555/0 + PL/2554/0 uploaded.

  18. DR/2557/0 + DR/2558/0 uploaded.

  19. Uploaded: DR/2528/2 DR/2500/4 DR/2533/2 DR/2532/2

  20. New Deep Drilling Screening Direction added.

  21. DR/2559/0 and DR/2559/1 - Uploaded

  22. DR/2509/2 uploaded

  23. DR/2509/1 - Uploaded

  24. DR/2375/4 - uploaded

  25. new screening directions added

  26. DR/2508/2 uploaded

  27. New Deep Drilling Screening Directions added.

  28. New Deep Drilling Screening Directions added.

  29. New Deep Drilling Screening Directions added.

  30. DR/2498/1 - Uploaded.

  31. DR/2487/3 - uploaded.

  32. DR/2491/2 - upload

  33. DR/2494/3 and DR/2538/0 uploaded

  34. Upload - DR/2508/1

  35. DR/2532/0 and DR/2533/0 uploaded

  36. DR/2528/0 - uploaded

  37. DR/2412/7, DR/2411/5, DR/2500/2 and DR/2510/1 uploaded

  38. Screening Direction added

  39. screening direction added

  40. DR/2518/0 - Uploaded.

  41. New Deep Drilling Screening Directions added.

  42. New Deep Drilling Screening Direction added.

  43. DR/2511/1 - Uploaded

  44. DR/2539/0 uploaded

  45. First published.

Sign up for emails or print this page