Research and analysis

Drying flood-damaged buildings: current guidance

Research report on drying flooded buildings and the guidance available.

Applies to England

Documents

Guidance and standards for drying flood damaged buildings: signposting current guidance

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alternativeformats@communities.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This research report on the drying out of flooded buildings looks at the processes involved and the existing guidance available. It also lists this guidance, much of which is freely available.

The research was carried out for the government by a consortium headed by the Construction Industry Research and Information Association (CIRIA), including the University of Wolverhampton, and commissioned following summer floods of 2007 and subsequent Pitt Review.

Updates to this page

Published 19 November 2010

Sign up for emails or print this page