Research and analysis

DECC Electricity Generation Costs (December 2013)

This report details the methodology, data and assumptions used to generate the levelised cost estimates.

Documents

Electricity generation costs (December 2013)

Details

This report presents levelised costs for electricity generation technologies. A ‘levelised cost’ is the average cost of the lifetime of the plant per MWh of electricity generated. They reflect the cost of building, operating and decommissioning a generic plant for each technology. The report details the methodology, data and assumptions used to generate the levelised cost estimates.

Updates to this page

Published 19 December 2013