Final report on the increased speed limit for heavy goods vehicles
Final report from a 3-year project to monitor the effect of increasing speed limits for HGVs over 7.5 tonnes in England and Wales.
Applies to England and Wales
Documents
Details
This is the final report from a 3-year project monitoring the impact of increasing the speed of heavy goods vehicles (HGVs) on single and dual carriageway roads. The project was designed to evaluate the impact in 3 main areas:
- traffic speeds and flows
- road safety
- environment (emissions and noise)
The report was produced by AECOM/Atkins and commissioned by the Department for Transport.
Background to the increased maximum speed limit for HGVs
On 6 April 2015 in England and Wales, the maximum speed limit for HGVs of over 7.5 tonnes was increased from:
- 40mph to 50mph on single carriageways
- 50mph to 60mph on dual carriageways
View:
- the second report on the increased speed for HGVs
- the first report on the increased speed limit for HGVs
- research into increasing the speed limit for HGVs