HS2 Independent Design Panel: Case Studies
A series of case studies about the work of the HS2 Independent Design Panel.
Documents
Details
The High speed Two (HS2) Independent Design Panel was set up in 2015 to help HS2 Ltd realise its aim of applying the best design principles to all its work. The panel has around 40 experts with a wealth of specialist experience providing independent advice to HS2 Ltd.
Updates to this page
Last updated 13 February 2024 + show all updates
-
Edgcote Viaduct case study added.
-
Mcr Ship Canal case study added
-
Added case studies for Curzon Street Station and Phase 2a - learning lessons.
-
Depots case study added
-
Urban integration case study added
-
Arts and mobilisation case studies added
-
addition of Case Study No.5 about rail operations and the Proxy Operator Strategy
-
Mentoring case study added
-
First published.