Policy paper

HS2 Phase 2b: Crewe to Manchester 2017 Route Engineering Report

Provides the technical details of the 2017 preferred route for the western leg of HS2 Phase 2b, between Crewe and Manchester.

Documents

Details

This report provides a detailed route description of the preferred route for High Speed Two (HS2) Phase 2b between Crewe and Manchester. This extends from the end of the Phase 2a route, south of the existing Network Rail station at Crewe, to Manchester and the West Coast Main Line (WCML) near Golborne. The report also includes a description of the stations and depots.

Updates to this page

Published 17 July 2017

Sign up for emails or print this page