Independent report

HS2 Phase Two: engineering options report - West Midlands to Manchester

Findings of the route engineering study for high speed rail between the West Midlands and Manchester.

This publication was withdrawn on

See the latest on HS2 Phase 2b.

Documents

HS2 phase two engineering options report West Midlands to Manchester part 1

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

HS2 phase two engineering options report West Midlands to Manchester part 2

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email HS2enquiries@hs2.org.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

A report to government by HS2 Ltd (March 2012)

This report gives detailed descriptions of the sections of route developed and finalised for the West Midlands to Manchester leg and describes the engineering layout and implications of the options studied.

MSG was commissioned by HS2 Ltd to undertake a study of route engineering options for a proposed high speed line between the West Midlands and Manchester, with a connection to the West Coast Main Line. Provision was to be made for stations serving Manchester city centre.

This report is complementary to HS2 Ltd’s report to government ‘Options for phase two of the high speed rail network’ and does not duplicate its contents.

This report should also be read in conjunction with volume 1 of the engineering report: ‘Options for phase two of the high speed rail network approach to design’.

HS2 phase two initial preferred route

HS2 phase two consultation

HS2 Ltd advice to government on phase two of HS2

Delivery partner reports to government on phase two of HS2

Background to HS2

Updates to this page

Published 28 January 2013

Sign up for emails or print this page