Habitats regulations assessment: non-technical summary
Updated 18 April 2023
Applies to England
1. Introduction
This is the habitats regulations assessment (HRA) non-technical summary of the Humber river basin district (RBD) flood risk management plan (FRMP).
The HRA has been undertaken in accordance with The Conservation of Habitats and Species Regulations (The Habitat Regulations) 2017 (as amended) and considers the potential implications of the FRMP on designated European conservation sites. These sites contain species and habitats that are important at a European scale.
The FRMP, covering the years between 2021 and 2027, seeks to manage significant flood-related issues in the Humber RBD, including 37 specifically identified Flood Risk Area. It covers an area of 26,100km2 and extends from the West Midlands in the south, northwards to North Yorkshire and from Staffordshire in the west to part of Lincolnshire and the Humber Estuary in the east. The Humber FRMP seeks to reduce a range of flooding threats, including from:
- rivers
- the sea
- surface
- water
- groundwater
- sewers
- canals
- reservoirs
The need for protecting human receptors should be viewed in the context of the environmental challenges present in the Humber RBD. Many geographic areas in the RBD are experiencing growth and need to mitigate climate change. Therefore, many freshwater and coastal habitats in the RBD, important in sustaining wintering wildfowl, fish populations and terrestrial species (for example otters), are subject to a wide range of human impacts, such as recreational pressure, reduced water flow / level, declining water quality and coastal squeeze.
This HRA assesses the potential for the Humber FRMP to result in likely significant effects (LSEs) and, where applicable, adverse effects on the integrity of European sites (such as the ability of those sites to achieve their conservation objectives).
2. Methodology
The Habitats Regulations 2017 (as amended) set out the specific assessment steps required for the HRA process.
The first step in the sequence of tests, often referred to as HRA screening, establishes whether a more detailed analysis known as ‘appropriate assessment’ is required. The purpose of HRA screening is to determine, in view of the best available scientific knowledge, whether a plan or project, either alone or in-combination with other plans or projects, could result in LSEs on European sites in view of their Conservation Objectives. If the Competent Authority determines that no LSEs are present (both alone and in-combination), then no further assessment is necessary.
3. Test of likely significant effects
All measures included in the Humber RBD were assessed for LSEs on the European sites across and within 10km of the RBD. None of the measures were identified to result in LSEs on any European site for a range of reasons, including that they are:
- too non-specific to assess meaningfully
- already being implemented - having undergone HRA previously
- being subjected to a separate consenting process - as applies to local flood risk management plans, shoreline management plans (SMPs) and coastal strategies
- desk-based and involving no physical activity on the ground
- remote from vulnerable sites
- worded such they are about ‘investigating’, ‘reviewing’ and ‘identifying opportunities’
One group of measures was found to commit to physical work on the ground by ‘delivering’ or ‘implementing’ flood management interventions, such as coastal defence structures or natural flood management approaches. The broad location of some measures, is known, enabling a broad assessment of their proximity to European sites and potential linking impact pathways. However, detailed HRA (including ‘appropriate assessment’) was deferred to either lower-tier plans or the planning application stage when details on the nature of proposals are available. This approach was adopted to account for the strategic (and thereby necessarily non-specific) nature of the FRMP, while also identifying the measures with the highest impact potential on European sites.
This HRA also identified that a range of measures in the Humber FRMP have the potential to improve the hydrological condition of European sites across the RBD, particularly in the River Derwent Special Area of Conservation (SAC) in terms of restoring natural flows and River Derwent Special Protection Area (SPA) / Ramsar, which is increasingly subject to prolonged winter flooding, as well as the River Mease SAC in terms of improving water quality and restoring natural flows.
Overall, it was shown that the FRMP represents a positive framework that will help achieve the conservation objectives of SAC, SPA and Ramsar in the region.
4. Other plans and projects
The potential for the FRMP to result in LSEs on European sites in-combination with (or when considered alongside) other plans and projects was also assessed. Many such plans are proposed across the RBD, which are associated with their own impact potential. For example, local authorities are proposing a minimum of 610,000 new dwellings and as well as employment land within the timescales of their current local plans and core strategies. There is also a potential for cumulative impacts with drought orders and permits, the Environment Agency national draught plan and SMPs.
Potential in-combination LSEs with local plan development were excluded due to most measures not being negatively linked to European sites, the fact that some measures are only included for completeness being driven by entirely separate plan processes, and the strategic nature of the FRMP. Meaning that those measures with potential interactions with European sites depend upon considerable further development before the presence of any impact pathways can be clearly identified.
5. Conclusion
LSEs of the FRMP on all European sites, both alone and in-combination, were excluded for all measures and an Appropriate Assessment was not required. This was based on various factors, including some measures being:
- carried over from the cycle 1 FRMP - which would have been subject to the statutory consenting process including HRA
- already implemented
- not associated with impact pathways linking to European sites
- too non-specific either in terms of specific location or their nature or both to allow for a detailed meaningful assessment
Notably, 25 measures were screened out at the strategic FRMP level but recommended for down-the-line HRA since the measures are sufficiently broadly expressed that they could be delivered without adverse effects but this will need to be reassessed as actual schemes are developed. As the details of potential schemes are developed towards the planning application stage, the HRA process will ensure that adequate mitigation measures, where relevant, are incorporated and the integrity of European sites will be protected.