Guidance

Using hydraulically bound mixtures at road works (TAL 3/14)

How to use hydraulically bound mixtures in the subbase and base layers of road reinstatements and their environmental advantages.

Documents

Using hydraulically bound mixtures at road works (TAL 3/14)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email webmasterdft@dft.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This traffic advisory leaflet (TAL) covers the use of hydraulically bound mixtures (HBMs) in road reinstatements layers.

HBMs have the potential advantages of:

  • fewer work lorry trips required
  • faster compaction times
  • reduced site occupation times

Updates to this page

Published 12 November 2014

Sign up for emails or print this page