Guidance

Treating small volumes of contaminated soil and groundwater: RPS 215

Environment Agency regulatory position on when you can carry out a small scale remediation scheme or trial to treat contaminated soil and groundwater.

Applies to England

Documents

Details

This regulatory position statement (RPS) does not change your legal requirement to have an environmental permit to treat contaminated soil and groundwater, and temporarily store the waste, when this is a:

  • waste operation
  • groundwater activity  (unless a registered exemption or exclusion applies)

However, the Environment Agency will not normally take enforcement action if you do not comply with these legal requirements if you meet the requirements in the RPS.

The regulatory position does not apply to any other legal requirements.

Updates to this page

Published 31 August 2018
Last updated 16 October 2024 + show all updates
  1. This RPS: now covers groundwater activities to allow in situ treatment of groundwater, requires use of the guidance land contamination risk management, replaces the term existing land contamination with historic, has a requirement for a calculation of how much groundwater will be treated based on hydrogeological data, sets out the requirements for secondary containment, has a restriction for the use of hazardous substances when treating groundwater, will be reviewed by 31 October 2027.

  2. This RPS clarifies: it can be used for pollution incidents; you must be a competent person to use it; if you are treating soil and groundwater together you must not exceed the 1,000 cubic metres limit; you must not store waste for more than 12 months; what records you must keep; and the requirements for emissions, noise and vibration, and odour. The record keeping requirements have changed from 6 years to 2 years. This RPS will be reviewed by September 2025.

  3. We have extended the review date of this RPS until September 2022.

  4. First published.

Sign up for emails or print this page