Lower Thames Crossing estimated costs and revenues
Estimated costs of operating, maintaining and tolling the Lower Thames Crossing, and proposed charges from a toll system.
Documents
Details
This report sets out the basis for and assumptions used to estimate: operating and maintenance costs, the costs of revenue collection using a free flow tolling system and toll revenues for an additional Lower Thames crossing at each location under consideration (together with the option C variant).
Related documents
- Consultation on options for a new Lower Thames Crossing, written ministerial statement by the Parliamentary Under-Secretary of State for Transport
- Consultation on location of new Thames crossing, press notice, 21 May 2013
- Options for a new Lower Thames Crossing video
- Options for a new Lower Thames Crossing
- Lower Thames Crossing model capability report
- Lower Thames Crossing design and costing report
- Central forecasts and sensitivity tests report
- Review of Lower Thames Crossing options: final review report