Magnox fuel strategy: contingency options
Contingency options for management of the Magnox Operating Programme (MOP 9) inventory in the event of failure of reprocessing capability.
Documents
Details
This document summarises the outcome of analysis of contingency options for the management of the Magnox Operating Programme (MOP 9) inventory in the event of unexpected and irreversible failure of the Magnox reprocessing capability. It presents the strategic position with respect to Magnox contingency arrangements.