MVA Mott MacDonald and RAND Model Development Report PFMv3-PFMv4.3
A series of model updates to the PLANET long distance model.
Documents
Details
This document describes the model development work undertaken through the Work Package 2 (WP2) contract for HS2 Ltd. The starting point for this was PLANET Framework Model (PFM) version 3.0 (PFM v3.0) and the ultimate product was PFM v4.3.