Oxford to Cambridge expressway strategic study: terms of reference

Sets out the terms of reference for and scope of the Oxford to Cambridge expressway strategic study.

This publication was withdrawn on

This information was replaced by the Oxford to Cambridge expressway strategic study: stage 3 report in Novemeber 2016.

Documents

Terms of reference for the Oxford to Cambridge strategic study

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email webmasterdft@dft.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

This document sets out:

  • the scope of work for the Oxford to Cambridge expressway study
  • the terms of reference for the project board
  • other aspects of project governance

Background to the Oxford to Cambridge expressway strategic study

The Oxford to Cambridge expressway strategic study is one of 6 strategic studies that will inform the development of the second phase of the Road investment strategy (RIS 2). The 6 studies address challenges and opportunities on our motorways and major roads which are too large and complex to fix in a single road period.

The study was announced as part of the first phase of the Road investment strategy (RIS 1) published in December 2014. The RIS 1 and RIS 2 set out a long-term approach to improve England’s motorways and major roads (the ‘strategic road network’).

Updates to this page

Published 18 August 2016