These vehicle and infrastructure projects have been given exemption from certain requirements under the Railways Interoperability Regulations 2011.
The determination letters are available on request from interoperability@dft.gov.uk.
Category | Company | Topic Type of Request | Description | Outcome | Date signed | NTSN/TSI |
---|---|---|---|---|---|---|
Exemption | Network Rail | Infrastructure | Regulation 14 decision on the customer information displays at Winslow Station. | Granted | 19/08/2024 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision on whether ENE NTSN authorisation is required for the South of Bedford OLE project | Granted | 27/07/2024 | ENE NTSN |
Decision | Siemens | Vehicle | Regulation 13 decision on whether an APIS is required for operating ETCS Level NTC or with ETCS in a transitional state. | Granted | 20/06/2024 | CCS NTSN |
Decision | Alstom | Vehicle | Regulation 13 decision to remove the authorisation requirements to retrofit the SWR Class 458/5 to a previously authorised design. | Granted | 19/06/2024 | LOC&PAS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision to remove the requirement to authorise the extensions of platforms at several stations on the Leeds Northwest Platform Extension Project | Granted | 18/06/2024 | INF NTSN |
Decision | GreenBrier | Vehicle | Regulation 14 decision in relation to the use of a specific composite brake blocks in freight wagons | Granted | 14/06/2024 | WAG NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision to remove the authorisation requirements of the INF NTSN for the Duddeston on network works project | Granted | 07/06/2024 | INF NTSN |
Exemption | Tees Valley Combined Authority | Infrastructure | Regulation 14 decision in relation to the staircase width of Darlington Station multistorey car park | Granted | 22/05/2024 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for tactile wayfinding at Morley Station | Granted | 22/04/2024 | PRM NTSN |
Decision | Grand Central | Vehicle | Regulation 13 decision for the operation of Class 180 vehicles in ETCS Level- National Train Control (L-NTC) mode. | Granted | 18/03/2024 | CCS NTSN |
Exemption | Alstom | Vehicle | Regulation 14 decision that an older version of NTRs can be used to gain authorisation for certain CL730/2 West Midlands AVENTRA trains due to them being at an advanced stage when the newer NTRs came into effect. | Granted | 29/01/2024 | LOC&PAS and CCS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for the Hairmyres Loop element of the East Kilbride Programme | Granted | 20/12/2023 | INF NTSN |
Decision | Network rail | Infrastructure | Regulation 13 decision that Authorisation is not required for the works to enable increased capacity in the Dore and Bamford areas. | Granted | 18/12/2023 | PRM and INF NTSN |
Exemption | Stadler | Vehicle | Innovative solutions exemption for a novel coupler solution on Stadler Class 93 units. | Granted | 22/05/2023 | LOC & PAS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for Hartlepool station redevelopment works | Refused | 16/05/2023 | PRM and INF NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for redevelopment works at Newbridge and Llanhilleth stations, but that the tactile wayfinding requirements may be disapplied. | Granted | 12/05/2023 | PRM NTSN |
Exemption | Siemens | Vehicle | Economic viability exemption for several standards in the CCS NTSN for some upgraded Class 717 units. | Granted | 05/05/2023 | CCS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for redevelopment works at Newbridge station, but that the shortest practical route requirements may be disapplied. | Granted | 18/04/2023 | PRM NTSN |
Decision | Scotland’s Railway | Infrastructure | Regulation 13 decision that authorisation is not required for three new electricity grid connection in Scotland | Granted | 15/03/2023 | ENE NTSN |
Decision | Transport for Wales | Infrastructure | Regulation 13 decision that authorisation is required for 7 upgrades on the Core Valley Lines and that the spoken information requirements must be applied. | Refused | 10/03/2023 | PRM NTSN |
Decision | Transport for Wales | Infrastructure | Regulation 13 decision that authorisation is required for 7 upgrades on the Core Valley Lines, but that the tactile wayfinding requirements may be disapplied. | Granted | 10/03/2023 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for the Transpennine Route Upgrade E234 project, but that the SRT NTSN may be disapplied. | Granted | 08/03/2023 | SRT NTSN |
Decision | Rhondda Cynon Taf County Borough Council | Infrastructure | Regulation 13 decision that authorisation is required for the Porth Transport Hub project, but that the tactile wayfinding requirements may be disapplied. | Granted | 01/03/2023 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for Casteleford development project, but that the tactile wayfinding requirements may be disapplied. | Granted | 01/03/2023 | PRM NTSN |
Exemption | Network Rail | Infrastructure | Innovative solutions exemption for a new station at East Linton regarding the danger area markings requirements in the PRM NTSN. | Granted | 22/02/2023 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for the Northern City Line ETCS project, but that one requirement in the CCS NTSN may be disapplied. | Granted | 20/12/2022 | CCS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for Gatwick Airport Development project and that the Braille/Prismatic information requirements should apply. | Refused | 13/12/2022 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for Gatwick Airport Development project, but that the tactile wayfinding requirements may be disapplied. | Granted | 13/12/2022 | PRM NTSN |
Exemption | Network Rail | Infrastructure | Economic viability exemption for one standard in the INF NTSN at Hayes and Harlington station. | Granted | 01/12/2022 | INF NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for works relocating station building at New Southgate station. | Granted | 30/11/2022 | PRM NTSN |
Decision | Scotland’s Railway | Infrastructure | Regulation 13 decision that authorisation is not required for upgrading the existing line near the new Inverness Airport station. | Granted | 24/11/2022 | INF NTSN |
Exemption | Barnet London Borough Council | Infrastructure | Innovative solutions exemption for a new station at Brent Cross West regarding the danger area markings requirements in the PRM NTSN. | Granted | 04/11/2022 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for the infrastructure works taking place on one platform at Dalton-in-Furness station. | Granted | 14/10/2022 | INF and PRM NTSNs |
Exemption | Network Rail | Infrastructure | Innovative solutions exemption for a new station at Inverness Airport regarding the danger area markings requirements in the PRM NTSN. | Granted | 30/08/2022 | PRM NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for the replacement of existing platform structures and additional works under the ‘Access for All’ scheme at Billingham station. | Granted | 30/08/2022 | INF and PRM NTSNs |
Exemption | Network Rail | Infrastructure | Innovative solutions exemption for Western Stage B ETCS project between Paddington and Heathrow, regarding the transition between Level 2/3 and Level NTC on the track. | Granted | 01/06/2022 | CCS NTSN |
Decision | Transport for Wales | Infrastructure | Regulation 13 decision that authorisation is not required for the Class B signalling project on the Core Valley Lines. | Granted | 10/05/2022 | CCS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for the Cambrian ETCS RBC upgrade between Dovey junction and Pwllheli station (known as the Pwllheli Line). | Granted | 28/02/2022 | CCS NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for Stage C ETCS system between Paddington and Stockley Junction is required. As part of the decision, the Department is enabling a non-compliance with the “metal free zone” limits outlined in the CCS NTSN. | Granted | 07/01/2022 | CCS NTSN |
Exemption | Scotland’s Railway | Infrastructure | Innovative solutions exemption for new station at Reston regarding the danger area markings requirements in the PRM NTSN. | Granted | 08/12/2021 | PRM NTSN |
Exemption | Reading Borough Council | Infrastructure | Innovative solutions exemption for new station at Reading Green Park regarding the danger area markings requirements in the PRM NTSN. | Granted | 08/12/2021 | PRM NTSN |
Exemption | Crossrail Ltd | Infrastructure | Innovative solutions exemption applying to eight stations for the SRT NTSN requirement regarding the width and height of the evacuation doors. | Granted | 05/11/2021 | SRT NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is required for a new ETCS system between Paddington and Stockley Junction. As part of the decision, the department is enabling four areas of non-compliance within the CCS NTSN. | Granted | 17/08/2021 | CCS NTSN |
Decision | Porterbrook | Vehicle | Regulation 13 decision that authorisation is not required for converting existing electric multiple-units (EMUs) into hydrogen-powered trains. | Granted | 17/08/2021 | LOC & PAS, SRT and NOI NTSN |
Decision | Thurrock Council | Infrastructure | Regulation 13 decision that authorisation is not required for the redevelopment of Stanford-le-Hope station. | Granted | 22/07/2021 | PRM NTSN and ENE NTSN |
Decision | Greater Anglia | Infrastructure | Regulation 13 decision that authorisation is not required for platform extensions at Hertford East, Ware, Broxbourne, Stratford, and Northumberland Park stations. | Granted | 09/07/2021 | INF NTSN and PRM NTSN |
Exemption | Crossrail Ltd | Infrastructure | Advanced stage exemption for some requirements in INF, CCS, SRT, PRM and ENE NTSNs. | Refused | 10/03/2021 | INF, CCS, SRT, PRM and ENE NTSNs |
Decision | Northumberland County Council | Infrastructure | Regulation 13 decision that authorisation is not required for the Northumberland Line track upgrade works. | Granted | 04/02/2021 | INF NTSN |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation is not required for the extension of platform 2 at Middlesbrough Station. | Granted | 01/02/2021 | INF and PRM NTSNs |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation of the new platforms and footbridge extension at Bletchley station is required but clause 4.2.1.2.3(2) of the PRM TSI can be disapplied. | Granted | 07/12/2020 | PRM TSI (2014/1300/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation of Wellingborough Platform 4 and footbridge extension is required but clause 4.2.1.2.3(2) of the PRM TSI can be disapplied. | Granted | 14/10/2020 | PRM TSI (2014/1300/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation of the Sussex Coastway platform extensions is not needed. | Granted | 30/07/2020 | PRM TSI (2014/1300/EU) and INF TSI (2014/1299/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision that authorisation of the Liphook Station footbridge renewal is needed and that the PRM TSI applies. | Granted | 10/03/2020 | PRM TSI (2014/1300/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision for upgrade of Severn Tunnel contact wire | Granted | 02/09/2019 | ENE TSI (2014/1301/EU) |
Derogation | Bombardier | Vehicle | Advanced stage derogation for East Anglia Class 720 and South Western Class 701 vehicles | Granted | 26/06/2019 | CCS TSI (2016/919/EU) |
Derogation | CAF | Vehicle | Addition of extra Class 195 vehicles to advanced stage derogation for GSM-R cab mobiles on CAF fleets | Granted | 05/06/2019 | CCS TSI (2016/919/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision for WAML upgrade of Tottenham Hale and Northumberland Park stations | Granted | 24/05/2019 | PRM TSI (2014/1300/EU) |
Decision | Network Rail (supplementary decision) | Infrastructure | Supplementary Regulation 13 decision under RIR 2011 relating to GSM-R Voice Cab Mobile | Granted | 31/10/2018 | CCS TSI (2016/919/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision under RIR 2011 relating to GSM-R Voice Cab Mobile | Granted | 02/10/2018 | CCS TSI (2016/919/EU) |
Derogation | Linsinger | Vehicle | Advanced stage derogation for Linsinger SF06-UK Duplex Rail Borne Milling Train | Granted | 26/09/2018 | CCS TSI (2016/919/EU) |
Derogation | Bombardier | Vehicle | Advanced stage derogation for new Class 710 Aventura (LOTRAIN) Electric Multiple Units | Granted | 20/09/2018 | CCS TSI (2016/919/EU) |
Dispensation | Crossrail Ltd | Infrastructure | Regulation 46 dispensation against the notified national technical rule for platform heights. | Granted | 11/05/2018 | NNTRs |
Derogation | Crossrail Ltd | Infrastructure | Advanced stage derogation for some requirements in INF, PRM and SRT TSI. | Granted | 12/04/2018 | INF, PRM and SRT TSI |
Derogation | Crossrail Ltd | Infrastructure | Advanced stage derogation for additional CCS TSI requirements introduced in 2016. | Granted | 19/01/2018 | CCS TSI (2016/919/EU) |
Derogation | Siemens | Vehicle | Advanced stage derogation for Siemens Desiro City Moorgate Class 717s | Granted | 12/01/2018 | CCS TSI (2016/919/EU) |
Decision | Network Rail-Thameslink | Infrastructure | Regulation 13 decision on public address noise levels and wheelchair spaces on platforms | Granted | 16/11/2017 | PRM TSI (2014/1300/EU) |
Decision | Hitachi Rail | Vehicle | Advanced stage derogation for East Coast Class 800/1s, 801s, and 801/2s | Granted | 14/09/2017 | CCS TSI (2016/919/EU) |
Derogation | Hitachi Rail | Vehicle | Advanced stage derogation for Great Western IEP fleet and Scotrail Class 385s | Granted | 13/09/2017 | CCS TSI (2016/919/EU) |
Derogation | Stadler Rail | Vehicle | Advanced stage derogation for Class 745s and 755s | Granted | 23/08/2017 | CCS TSI (2016/919/EU) |
Derogation | Stadler Rail Valencia | Vehicle | Advanced stage derogation for Merseyrail EMUs | Granted | 23/08/2017 | CCS TSI (2016/919/EU) |
Derogation | Plasser UK Ltd | Vehicle | Advanced stage derogation for On-Track Machine vehicles used on the Crossrail network | Granted | 20/06/2017 | CCS TSI (2016/919/EU) |
Derogation | Network Rail | Infrastructure | Advanced stage derogation for GSM-R infrastructure in the Heathrow tunnels | Granted | 20/06/2017 | CCS TSI (2016/919/EU) |
Decision | Vivarail | Vehicle | Regulation 13 decision on pass-by noise requirements for Class 230s | Granted | 07/06/2017 | Noise TSI (2014/1304/EU) |
Decision | Network Rail-Thameslink | Infrastructure | Regulation 13 decisions and advanced stage derogation for Thameslink infrastructure | Granted | 08/05/2017 | CCS TSI (2016/919/EU); PRM TSI (2014/1300/EU); SRT TSI (2014/1303/EU); INF TSI (2014/1299/EU); ENE TSI (2014/1301/EU) |
Derogation | Rail for London Limited | Vehicle | Advanced stage derogation for Crossrail Class 345s | Granted | 24/04/2017 | CCS TSI (2016/919/EU) |
Derogation | Loram | Vehicle | Advanced stage derogation for Loram C44 rail grinder vehicles | Granted | 27/03/2017 | CCS TSI (2016/919/EU) |
Derogation | CAF Rail UK Ltd | Vehicle | Advanced stage derogation for Class 195s, 331s, 397s and Mk5a coaches | Granted | 08/03/2017 | CCS TSI (2016/919/EU) |
Derogation | Linsinger | Vehicle | Advanced stage derogation for MG31-UK rail borne milling train | Granted | 08/03/2017 | CCS TSI (2016/919/EU) |
Derogation | GE Transportation | Vehicle | Advanced stage derogation for Class 70 locomotives | Granted | 08/03/2017 | CCS TSI (2016/919/EU) |
Derogation | Stadler Rail Valencia | Vehicle | Advanced stage derogation for Class 68 and 88 locomotives | Granted | 08/03/2017 | CCS TSI (2016/919/EU) |
Derogation | Siemens AG | Vehicle | Advanced stage derogation for South West Trains Class 707s | Granted | 22/12/2016 | CCS TSI (2016/919/EU) |
Derogation | Eurotunnel | Vehicle | Advanced stage derogation for Krupp locomotives project | Granted | 15/12/2016 | CCS TSI (2016/919/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision for national Class B signalling project | Granted | 13/12/2016 | CCS TSI (2016/919/EU) |
Derogation | Siemens AG | Vehicle | Advanced stage derogation for Thameslink Class 700s | Granted | 20/10/2016 | CCS TSI (2016/919/EU) |
Decision | Network Rail Infrastructure Ltd | Infrastructure | Regulation 13 decision for Heathrow Tunnels ETCS system | Granted | 25/08/2016 | CCS TSI (2016/919/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision for fitting KVB signalling system at Ashford International Station | Granted | 04/12/2015 | CCS TSI (2012/88/EU) |
Decision | HS1 Limited | Infrastructure | Regulation 13 decision for HS1 GSM-R project | Granted | 12/02/2015 | HS CCS TSI (2006/860/EC) |
Derogation | Network Rail Infrastructure Ltd | Vehicle | Advanced stage derogation for new build switch and panel crossing vehicles | Granted | 17/10/2014 | WAG TSI (2013/321/EU) |
Decision | Network Rail | Infrastructure | Regulation 13 decision on national Class B resignalling projects | Granted | 06/02/2014 | CCS TSI (2012/88/EU) |
Derogation | Transport for London | Infrastructure | Advanced stage derogation for INF TSI requirements for Crossrail central section. | Granted | 10/09/2012 | INF TSI (2011/275/EU) |
Derogation | Transport for London | Infrastructure | Economic viability derogation for CCS TSI requirements for the Crossrail core section. | Granted | 17/02/2012 | CCS TSI (2006/679/EU) |