Recovered appeals: A + B: land at Scout Moor Wind Farm, Rossendale, Lancashire (ref: A 3139740 + B 3139737 - 6 July 2017)
Decision letter and Inspector’s Report for a recovered appeal
Applies to England
Documents
Details
Decision letter and Inspector’s Report for a recovered appeal for the construction and operation of 16 wind turbines with a maximum height to the tip of the blade of 115 metres (above ground level) for a temporary period of 25 years.