Renewables obligation level calculations: 2015 to 2016
This paper sets out the methodology used in calculating the size of the Obligation.
Documents
Details
The Renewables Obligation Order (ROO) 2009 requires the Secretary of State to announce the level of the Obligation six months preceding an Obligation period. This announces the size of the Obligation for the 2015/16 period.