Renewables obligation level calculations: 2017/18
This paper sets out the methodology used in calculating the size of the obligation.
Documents
Details
The Renewables Obligation Order 2015 requires the Secretary of State to announce the level of the obligation 6 months preceding an obligation period. This announces the size of the obligation for the 2017 to 2018 period.
Update - Typographical errors in the technology breakdowns in the table on page 7 of the paper have been corrected in the above copy. The overall number of enewables obligation certificates (ROCs) has not changed, nor has the level of the obligation.