SR2015 No 34: temporary scaffolding affecting up to 20 metres of a main river
Standard rules for temporary scaffolding affecting up to 20 metres length of a main river.
Applies to England
Documents
Details
These rules allow you to erect and use temporary scaffolding affecting up to 20 metres length of a main river for a maximum of 8 weeks.
These rules do not allow you to erect or use scaffolding:
- on or within 8 metres of flood defences
- during the fish breeding season