SR2019 No 1: installation of mooring pile in a main river
Standard rules for installation of mooring pile in a main river.
Applies to England
Documents
Details
These rules allow you to install a mooring pile into a main river.
These rules do not allow the activity:
- within 8 metres of a flood defence
- within 50m of another mooring pile
- during the fish breeding season