SR2021 No 4: composting in closed systems – installations
For a Part A installation with a treatment capacity of more than 75 tonnes each day accepting no more than 75,000 tonnes each year.
Applies to England
Documents
Details
You can apply for this standard rules permit if:
- your activity meets the rules set out in the permit
- you can manage the potential risks as set out in the generic risk assessment
Updates to this page
Last updated 17 July 2023 + show all updates
-
Corrected an error. Under 'Excluded wastes' changed the exclusion for plastic and litter of no more than 1% weight for weight (w/w) to 5% w/w. This is consistent with the list of accepted waste types and other standard rule sets.
-
Added 'or habitats' to the conservation screening distance in the Introductory note and under section 2.2 The site.
-
First published.