SR2022 No 4: non-hazardous waste recycling with asbestos, hazardous batteries, cable and WEEE storage

Standard rules to operate a household, commercial and industrial waste transfer station with treatment. These rules also allow the storage of asbestos, batteries, cable and waste electrical and electronic equipment (WEEE).

Applies to England

Documents

Details

This standard rules permit allows you to operate a waste facility transferring and treating a range of non-hazardous wastes. These rules also allow storage of asbestos, batteries, cable and waste electrical and electronic equipment (WEEE).

You can apply for this standard rules permit if: 

  • your activity meets the rules set out in the permit 

  • you can manage the potential risks as set out in the generic risk assessment 

The charges for applying for this standard rules permit are: 

  • £3,926 for a new standard rules permit application 

  • £792 for a minor variation to the permit 

  • £2,529 to transfer the permit 

  • £1,585 to surrender the permit 

There is also an annual subsistence charge of £4,169 for the standard rules permit. 

You can get advice before you apply for a permit

How to apply for an environmental permit

This permit replaces:  

If you cannot comply with the new standard rules permit you will need to apply to vary your permit into a bespoke permit. You must apply within 3 months of the date the standard rules was published (18 December 2024).

Updates to this page

Published 18 December 2024