Guidance

Storing and treating waste plastic produced from processing WEEE: RPS 228

When you can store and treat waste plastic produced from processing waste electrical and electronic equipment (WEEE) without the correct waste codes on your permit.

This publication was withdrawn on

This regulatory position statement has expired. All 4 permits affected by receiving, storing and processing waste plastics from WEEE, without the correct EWC codes on the permit, have now been varied to include the code covered by the RPS.

Applies to England

Documents

Details

If you comply with the conditions in this regulatory position statement (RPS) you can store and treat waste plastic produced from processing WEEE without the correct waste codes on your permit.

Updates to this page

Published 23 December 2019
Last updated 16 December 2020 + show all updates
  1. We have extended the expiry date of the RPS to 30 June 2021.

  2. We have extended the expiry date of this regulatory position statement (RPS) from 31 July 2020 to 31 December 2020.

  3. First published.

Sign up for emails or print this page