Details of the application

The Environment Agency has received an application to vary an environmental permit under the Environmental Permitting (England and Wales) Regulations 2016 from NNB Generation Company (HPC) Limited.

Application number

EPR/JP3122GM/V007

Regulated facility type

Water Management Zones and effluent treatment units

Regulated facility location

Construction site at Hinkley Point C power station
Near Bridgwater
Somerset
TA5 1UD

National grid reference discharge point

ST 19315 46475

Receiving environment

Severn Estuary

Effluent type

Trade effluent consisting of tunnelling effluent and muck bay drainage

Volume

30 litres per second plus rainfall dependent surface water runoff

The proposal is to vary the permit to include the discharge of tunnelling effluent & muck bay drainage via a new outfall at the seaward end of a temporary jetty. The tunnelling effluent will be generated through the construction of the power station cooling waters system tunnels. It will include groundwater and contain low concentrations of soil conditioning chemicals. The muck bay drainage will consist of leachate from the tunnelling spoil containing low concentrations of soil conditioning chemicals and low volumes of groundwater, as well as a rainfall dependant element of surface water runoff from the muck bay curtilage.

How to view the application

You can view the information on the Environment Agency register

Environment Agency
Public Register
Rivers House
East Quay
Bridgwater
TA6 4YS

You can view the register from 9.30am to 4.30pm, Monday to Friday. Call the Environment Agency on 03708 506 506 to arrange an appointment. You can ask for a copy of documents on the register. The Environment Agency may charge to cover copying costs.

How to comment on the application

If you have any comments on the application send these by 19 December 2017.

Email: psc-waterquality@environment-agency.gov.uk

Online: view and comment on the application using Citizen Space https://consult.environment-agency.gov.uk/psc/ta5-1ud-nnb-generation-company-hpc-limited-v007

Or write to:

Environment Agency
Permitting and Support Centre
WQ Team
Quadrant 2
99 Parkway Avenue
Sheffield
S9 4WF

The Environment Agency will normally put any responses it receives on the public register. This includes your name and contact details. Tell us if you don’t want your response to be public.

We must decide whether to grant or refuse the application. If we grant it, we must decide what conditions to include in the permit.