Thames Tunnel evidence assessment final report
An assessment of the current evidence produced on the options for dealing with untreated sewage polluting the River Thames.
Documents
Details
An assessment of the current evidence produced on the options designed to address the problem of untreated sewage polluting the River Thames was completed in February 2012.
The purpose of the assessment was to ensure that due consideration has been given to the full range of evidence available on all the proposed options to address sewage in the Thames and to provide an assessment of the nature of that evidence.
The final report of the assessment and accompanying annex which lists the evidence collected are available below:
- Thames Tunnel Evidence Assessment Final Report (pdf, 297 KB)
- Annex (pdf, 300 KB)