Policy paper

Greatmoor Railway Sidings Transport and Works Act Order: Explanatory Memorandum

The Explanatory Memorandum explains the purpose and effects of the order provisions.

Documents

Explanatory Memorandum for TWAO

Details

High Speed Two (HS2) Ltd is proposing to construct railway sidings and associated works adjacent to the Aylesbury Link Railway for the loading and offloading of spoil and waste material to the Calvert Landfill and the Greatmoor Energy from Waste Facility in the District of Aylesbury Vale. The Explanatory Memorandum explains the purpose and effects of the order provisions, and should be read alongside existing Greatmoor Railway Sidings Transport and Works Act Order (TWAO) documents.

Updates to this page

Published 9 August 2016

Sign up for emails or print this page