Interim report 01/2013: Partial failure of a structure inside Balcombe tunnel

RAIB interim report into a partial failure of a structure inside Balcombe tunnel on 23 September 2011

The Rail Accident Investigation Branch (RAIB) has released its interim report into a partial failure of a structure inside Balcombe tunnel on 23 September 2011.

 

IR12013-130124-Balcombe.pdf

Updates to this page

Published 10 December 2014