Report 10/2023: Freight train derailment at Petteril Bridge Junction

Freight train derailment at Petteril Bridge Junction, Carlisle, 19 October 2022.

R102023_231010_Petteril Bridge Junction

Summary

At 19:53 hrs on Wednesday 19 October 2022, five tank wagons in a freight train that was conveying cement powder from Clitheroe, Lancashire, to Mossend, near Glasgow, derailed near Petteril Bridge Junction in Carlisle. A number of wagons were damaged and there was significant damage to the track and to the bridge over the River Petteril. This resulted in closure of the routes from Carlisle to Newcastle- upon- Tyne and to Settle for seven weeks. No one was injured.

The derailment occurred because one set of wheels on the ninth wagon in the train stopped rotating during the journey. These wheels had stopped rotating up to 55 miles (88 km) before the derailment and continued to slide along the railhead causing considerable damage to the profile of the wheel treads. This meant that the wheels were unable to safely negotiate a set of points just before Petteril Bridge Junction, damaging them and causing the ninth wagon to become derailed. Five of the wagons derailed due to the consequent track damage and two of them fell off the side of the bridge where the railway crosses the River Petteril. The ninth tank wagon was ruptured and landed upside down in the river, although very little of the cement powder was spilled.

The initial wheel slide was probably the result of a normal brake application made in low adhesion conditions that were not abnormal for the route at the time of year. The wheel slide continued because the adhesion between the wheels and the rails was then insufficient for the wheels to restart rotation.

The non-rotating wheels were not identified by the signallers on the route, nor by the train driver or any engineered system, meaning that the train was not stopped before it reached Petteril Bridge Junction.

Recommendations

RAIB has made one recommendation to the railway industry to undertake work to understand the specific risks to freight trains in low adhesion conditions. RAIB has also made two recommendations to the railway industry relating to reviewing the railway Rule Book requirements for stopping and examining trains and the requirements relating to drivers looking back along their trains.

RAIB has also identified one learning point for signallers, reminding them of the circumstances in which they should stop trains for examination.

Response to recommendations:

  • RAIB will periodically update the status of recommendations as reported to us by the relevant safety authority or public body
  • RAIB may add comment, particularly if we have concerns regarding these responses.

RAIB Recommendation response for Petteril Bridge Junction

Updates to this page

Published 10 October 2023