SEACAP 21. Module 1 Report: Project planning and initiation.
Abstract
The scope of work for SEACAP 21 is divided into four modules. This report is concerned with the first module, Module 1 Project Planning and Initiation. Described are the preparation of the trial slope stabilization designs, specifications and cost estimates and the drafting of the data collection programme, training and dissemination strategies. This study aims at identifying cost-effective equipment supported community-based methods of improving all-year access to the rural poor through low-cost resource-base engineering techniques to reduce/eliminate land-slips.
Citation
26 pp.
Links