Skip to main content
Rail

Policy papers and consultations

Skip to results
1,243 results sorted by Updated (newest)
  • A report presenting the committed developments relevant to land quality and the risk assessments associated with land contamination in MA02.

  • A report that presents the methodology for the greenhouse gas emissions associated with the construction and operation for High Speed Two, Phase 2b Crewe – Manchester.

  • A report presenting a description of the historic landscape character areas in MA02.

  • A report presenting a summary gazetteer of the heritage assets, the impact assessment tables and a summary of the Archaeological character areas and sub-zones relating to MA02.

  • A report containing health assessment matrices for MA02 which identify impacts on health determinants (environmental, social and economic factors known to influence health) and apply assessment criteria to evaluate the healt…

  • A summary of anticipated local/parish level adverse effects on ecological receptors in MA02.

  • A report presenting the record sheets for the community impact assessment during construction and operation in MA02.

  • A report containing the baseline air quality data, the construction dust assessment and the assessment of road traffic emissions for MA02.

  • A report presenting the community open space condition surveys undertaken for MA02.

  • This report includes soil and agricultural baseline data and a summary of the farm holding impact assessment in MA02.

  • The glossary of terms, list of abbreviations and references for all volumes of the environmental statement.

  • An introduction to the Environmental Statement. This volume provides an overview of the Proposed Scheme and the environmental impact assessment process.

  • Provides a summary, in non-technical language, of the High Speed Rail (Crewe – Manchester) Environmental Statement.

  • Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA03.

  • A report presenting the results of the hydraulic modelling undertaken for Small Brook.

  • A report describing the existing flood risks in MA05, how High Speed Two, Phase 2b Crewe – Manchester will affect these and how adverse effects will be mitigated.

  • A report describing the existing water resources in MA05, how High Speed Two, Phase 2b Crewe – Manchester will impact these and how adverse effects will be mitigated.

  • A report considering the impacts of High Speed Two, Phase 2b Crewe – Manchester on all modes of transport in MA05.

  • A report setting out the detailed assessment of operational sound, noise and vibration levels for MA01.

  • A report presenting the existing and forecast future baseline transport network conditions in MA06, MA07 and MA08 and the expected traffic and transport effects of High Speed Two, Phase 2b Crewe – Manchester may have on thes…