Skip to main content
HS2

Policy papers and consultations

Skip to results
966 results sorted by Updated (newest)
  • A report containing the baseline air quality data, the construction dust assessment and the assessment of road traffic emissions for MA04.

  • A Map Book presenting the features relevant to the landscape and visual assessment in MA01.

  • This report presents a summary of engagement undertaken, the landscape character assessment, the photomontages and assessment matrices for MA01.

  • A report presenting the committed developments relevant to land quality and the risk assessments associated with land contamination in MA01.

  • A report presenting a description of the historic landscape character areas in MA01.

  • A report presenting a summary gazetteer of the heritage assets, the impact assessment tables and a summary of the Archaeological character areas and sub-zones relating to MA01.

  • A report containing health assessment matrices for MA01 which identify impacts on health determinants (environmental, social and economic factors known to influence health) and apply assessment criteria to evaluate the healt…

  • A summary of anticipated local/parish level adverse effects on ecological receptors in MA01.

  • A report presenting the community open space condition surveys undertaken for MA01.

  • A report presenting the record sheets for the community impact assessment during construction and operation in MA01

  • A report containing the baseline air quality data, the construction dust assessment and the assessment of road traffic emissions for MA01.

  • This report includes soil and agricultural baseline data and a summary of the farm holding impact assessment in MA01.

  • A report describing the existing water resources in MA02, how High Speed Two, Phase 2b Crewe – Manchester will impact these and how adverse effects will be mitigated.

  • Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA07.

  • Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA06.

  • Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA08.

  • Presents the likely significant effects of the construction and operation of High Speed Two, Phase 2b Crewe – Manchester on the environment within MA04.

  • Presents the likely significant effects of the construction and operation of High Speed Two Phase 2b Crewe – Manchester on the environment within MA01

  • The Minister of State for Transport is consulting on 4 proposed refinements to the design of the Western Leg of HS2 Phase 2b.

    First published during the 2019 to 2022 Johnson Conservative government

  • Outlines the decision to confirm the proposed design refinements to the HS2 Phase 2b route between Crewe and Manchester.

    First published during the 2019 to 2022 Johnson Conservative government