Table 1 - Total departmental spending, 2018-19 to 2022-23

This table provides a summary of departmental net expenditure using the same headings as voted within the Estimate.

2018‑19
Outturn
£’000
2019‑20
Outturn
£’000
2020‑21
Outturn
£’000
2021‑22
Outturn
£’000
2022‑23
Outturn
£’000
Resource DEL          
Deliver an ambitious industrial strategy 182,286 908,525 18,822,515 4,140,456 307,905
Maximise investment opportunities and bolster UK interests 70,705 73,225 90,816 131,652 39,031
Promote competitive markets and responsible business practices 116,245 81,333 123,553 208,835 229,534
Delivering affordable energy for households and businesses 44,155 38,974 83,933 90,117 12,623,329
Ensuring that our energy system is reliable and secure 4,756 4,723 5,789 903,253 (360,436)
Taking action on climate change and decarbonisation 24,829 32,518 53,099 83,176 61,192
Managing our energy legacy safely and responsibly 251,870 234,186 216,909 195,797 196,899
Science and Research 4,608 6,159 29,390 43,497 8,901
Capability 393,848 415,591 482,229 486,262 553,709
Government as Shareholder 41,017 36,273 1,595,733 1,314,153 (13,836)
Deliver an ambitious industrial strategy (ALB) net 15,147 21,077 13,127 - -
Promote competitive markets and responsible business practices (ALB) net 52,749 53,634 61,407 59,308 63,367
Ensuring that our energy system is reliable and secure (ALB) net (2,667) (2,756) (2,297) (3,039) (1,621)
Taking action on climate change and decarbonisation (ALB) net 6,069 8,260 11,217 15,733 22,668
Managing our energy legacy safely and responsibly (ALB) net 32,075 28,719 32,055 39,668 39,193
Science and Research (ALB) net 276,226 231,165 227,334 238,498 236,192
Capability (ALB) net 30,475 34,693 11,103 12,379 14,576
Government as Shareholder (ALB) net (18,838) 49,962 (7,246) 20,266 39,977
NDA and SLC expenditure (ALB) net 1,175,337 1,330,218 1,245,231 1,427,904 1,539,120
Deliver an ambitious industrial strategy (CFER) - - - (1,454) (773)
Science and Research (CFER) - - - (555) (106)
Nuclear Decommissioning Authority Income (CFER) (978,373) (748,104) (599,466) (693,853) (1,033,030)
Total Resource DEL 1,245,244 2,838,375 22,496,431 8,712,053 14,565,791
Of which:          
– Staff costs 605,821 682,747 816,131 867,646 989,564
– Purchase of goods and services 1,936,315 3,394,359 3,142,383 2,990,283 2,932,952
– Income from sales of goods and services (996,751) (764,171) (615,649) (713,994) (1,054,157)
– Current grants to local government (net) 22,388 183,159 8,121,959 3,936,064 66,030
– Current grants to persons and non-profit bodies (net) 133,554 177,281 187,621 200,733 12,595,256
– Current grants abroad (net) 72,274 51,593 75,568 98,113 37,505
– Subsidies to private sector companies 141,423 100,481 12,481,812 1,439,916 166,067
– Subsidies to public corporations 61,530 50,081 53,903 953,283 (325,805)
– Net public service pensions[Note 2] (12) (13) (19) - -
– Rentals 37,077 46,630 49,830 2,538 (934)
– Depreciation[Note 1] 310,652 331,470 270,073 335,950 327,126
– Take up of provisions - (32,162) 37,965 (33,722) 5,337
– Change in pension scheme liabilities 547 579 228 243 26
– Other resource (1,079,574) (1,383,659) (2,125,372) (1,365,000) (1,173,176)
Resource AME          
Deliver an ambitious industrial strategy (312,599) 10,733,189 (10,747,128) (62,525) (94,470)
Maximise investment opportunities and bolster UK interests 6,044 701 (1,217) (703) (636)
Promote competitive markets and responsible business practices 79,228 72,282 89,422 72,940 104,991
Delivering affordable energy for households and businesses - - - - 31,138,640
Ensuring that our energy system is reliable and secure (295) 478 (4,108) 338,849 (346,917)
Taking action on climate change and decarbonisation - - 667 241 (2,843)
Managing our energy legacy safely and responsibly (297,497) (203,397) (208,322) (78,851) (29,702)
Science and Research 205,985 54,912 86,053 109,627 19,707
Capability (12,990) (55,895) (41,033) 5,305 (16,731)
Government as Shareholder 807 10,006 17,150 178,940 (69,604)
Renewable Heat Incentive 817,898 846,092 848,139 919,555 1,001,880
Deliver an ambitious industrial strategy (ALB) net (14,444) 36,202 (71,456) 473 43,059
Promote competitive markets and responsible business practices (ALB) net 57 973 (221) 375 (47)
Taking action on climate change and decarbonisation (ALB) net (2,971,284) 3,543,428 468,485 10,015,257 (13,507,265)
Managing our energy legacy safely and responsibly (ALB) net (2,022,249) 22,826 231,227 3,112,786 (3,385,547)
Science and Research (ALB) net 41,299 149,372 64,982 192,049 77,990
Capability (ALB) net 1 4 - 10 -
Government as Shareholder (ALB) net 47,451 (99,851) (354,185) (520,071) 90,013
Nuclear Decommissioning Authority (ALB) net (101,791,292) 4,371,679 1,027,590 100,605,107 (110,365,377)
Promote competitive markets and responsible business practices 319,330 431,123 441,841 260,991 263,156
Total Resource AME (105,904,550) 19,914,124 (8,152,114) 115,150,355 (95,079,703)
Of which:          
– Staff costs 4,404 5,165 5,714 6,164 5,520
– Purchase of goods and services 145,292 164,120 150,800 44,400 79,650
– Income from sales of goods and services (3) (5) - - -
– Current grants to persons and non-profit bodies (net) 416,439 513,128 540,717 482,671 20,913,090
– Subsidies to private sector companies 817,898 846,092 848,814 777,246 8,361,800
– Subsidies to public corporations - - - 345,889 (345,889)  
– Rentals (2,198) (2,069) (2,035) (2,585) (2,488)
– Depreciation [Note 1] (1,882,868) 5,575,119 2,602,318 9,815,622 (12,857,824)
– Take up of provisions (101,359,925) 17,774,375 4,017,592 106,997,559 (108,306,175)
– Release of provision (3,078,344) (3,035,901) (13,944,296) (3,350,663) (3,340,776)
– Change in pension scheme liabilities 29,717 32,501 29,005 40,871 32,396
– Unwinding of the discount rate on pension scheme liabilities 37,782 38,348 33,467 33,125 44,363
– Other resource (1,032,744) (1,996,749) (2,434,210) (39,944) 336,630
Total Resource Budget (104,659,306) 22,752,499 14,344,317 123,862,408 (80,513,912)
Of which:          
– Depreciation [Note 1] (1,572,216) 5,906,589 2,872,391 10,151,572 (12,530,698)
Capital DEL          
Deliver an ambitious industrial strategy (54,606) (14,440) 227,102 240,578 50,265
Maximise investment opportunities and bolster UK interests 243,957 265,872 492,700 299,682 210,137
Promote competitive markets and responsible business practices 5,940 6,643 23,159 19,956 (4,952)
Delivering affordable energy for households and businesses 32,718 44,502 1,184,722 1,256,203 365,904
Ensuring that our energy system is reliable and secure (626) 291 277 1,005,678 2,076,559
Taking action on climate change and decarbonisation 73,121 154,227 239,432 281,860 221,570
Managing our energy legacy safely and responsibly 4,278 3,461 5,074,050 5,620,909 11,836
Science and Research 563,177 691,794 787,076 727,173 979,710
Capability 30,305 19,703 35,399 28,012 23,367
Government as Shareholder 172,613 61,445 1,069,581 322,341 142,010
Deliver an ambitious industrial strategy (ALB) net - - (8) - -
Promote competitive markets and responsible business practices (ALB) net 1,236 2,030 1,682 2,010 1,830
Ensuring that our energy system is reliable and secure (ALB) net - - - - 840,898
Taking action on climate change and decarbonisation (ALB) net 255 27 284 2,500 1,629
Managing our energy legacy safely and responsibly (ALB) net 12,128 12,919 17,915 25,769 24,290
Science and Research (ALB) net 7,530,042 7,786,590 9,125,825 8,691,692 9,567,396
Capability (ALB) net 2,482 30 2,298 3,558 3,313
Government as Shareholder (ALB) net 337,642 395,639 368,759 456,799 199,646
NDA and SLC expenditure (ALB) net 2,002,699 1,797,184 1,799,723 2,023,096 2,192,595
Deliver an ambitious industrial strategy (CFER) - - - (13,333) (13,333)
Science and Research (CFER) - - - (2,091) (2,102)
Total Capital DEL 10,957,361 11,227,917 20,449,976 20,992,392 16,892,568
Of which:          
– Staff costs 502,376 535,339 612,263 691,071 718,255
– Purchase of goods and services 833,595 819,845 837,114 2,909,334 3,195,835
– Income from sales of goods and services (260,137) (273,845) (261,268) (306,808) (193,794)
– Current grants to persons and non-profit bodies (net) 5,744,797 6,274,041 7,204,570 7,085,874 7,619,449
– Current grants abroad (net) 340,794 346,659 401,898 412,292 598,307
– Subsidies to private sector companies - - - - 343
– Subsidies to public corporations - 4,808 21 31 22
– Capital support for local government (net) 5,826 1,588 1,151,761 652,693 (133,474)
– Capital grants to persons & non-profit bodies (net) 888,564 725,074 841,616 496,632 658,859
– Capital grants to private sector companies (net) 35,518 96,127 160,355 285,675 218,138
– Capital grants abroad (net) 308,624 449,475 697,326 485,802 515,894
– Capital support for public corporations 204,229 94,985 74,703 1,462,994 2,551,211
– Purchase of assets 2,345,321 2,176,780 2,285,092 448,235 1,220,727
– Income from sales of assets (23,144) (36,518) (138,116) (9,659) (15,040)
Net lending to the private sector and abroad 163,080 88,455 1,654,821 798,760 (17,919)
Other capital (132,082) (74,896) 4,927,820 5,579,466 (44,245)
Capital AME          
Promote competitive markets and responsible business practices - - - 151 -
Managing our energy legacy safely and responsibly 35,412 29,419 29,382 23,091 18,677
Science and Research 1,212 1,263 1,247 1,271 1,266
Capability - - - 144 -
Government as Shareholder (120,000) 37,000 19,718,443 (3,596,201) 1,321,715
Deliver an ambitious industrial strategy (ALB) net (16,387) 365 (8,954) (13,310) 4,140
Taking action on climate change and decarbonisation (ALB) net - - - 54 74
Managing our energy legacy safely and responsibly (ALB) net - - - - 558
Science and Research (ALB) net (59,692) (59,496) (53,610) (57,467) (75,887)
Government as Shareholder (ALB) net (11,143) (3,051) (221) (4,975) -
Managing our energy legacy safely and responsibly (CFER) (141,811) (142,400) (142,400) (142,400) (142,400)
Total Capital AME (312,409) (136,900) 19,543,887 (3,789,642) 1,128,143
Of which:          
– Staff costs (15,325) (14,078) (19,813) (17,149) (18,269)
– Purchase of goods and services (2,330) (4,890) 3,149 (1,169) (778)
– Take up of provisions - - - 349 632
– Capital grants to private sector companies (net) - - 19,781,449 (3,524,201) 1,266,715
– Capital support for public corporations (120,000) 37,000 (63,006) (72,000) 55,000
– Net lending to the private sector and abroad (169,341) (145,086) (151,575) (160,685) (138,260)
– Other capital (5,413) (9,846) (6,317) 353,213 (36,897)
Total Capital Budget 10,644,952 11,091,017 39,993,863 17,202,750 18,020,711
Total Departmental spending [Note 3] (92,442,138) 27,936,927 51,465,791 130,913,586 (49,962,503)
Of which:          
– Total DEL 11,891,953 13,734,822 42,676,336 29,368,495 31,131,233
– Total AME (104,334,091) 14,202,105 8,789,455 101,545,091 (81,093,736)

Referenced notes:

  1. Includes impairments
  2. Pension schemes report under FRS 17 accounting requirements. These figures therefore include cash payments made and contributions received, as well as certain non-cash items
  3. Total departmental spending is the sum of the resource budget and the capital budget less depreciation. Similarly, total DEL is the sum of the resource budget DEL and capital budget DEL less depreciation in DEL, and total AME is the sum of resource budget AME and capital budget AME less depreciation in AME.

Other notes:

The large increase in spend in 2020-21 on Deliver an ambitious industrial strategy Resource DEL is due to the COVID-19 Business Support Grants (also reflected in the increase for Subsidies to private sector companies and Current grants to local government).

The large increase in spend in 2020-21 on Science and Research Resource DEL is due to the Vaccines Taskforce.

The large increase in spend in 2020-21 and 2021-22 on Government as Shareholder Resource DEL is due to the COVID-19 business support loans.

The large increase in spend in 2019-20 and decrease in 2020-21 on Deliver an ambitious industrial strategy Resource AME is due to the provision raised in 2019-20 for COVID-19 Business Support Grants.

The large increase in spend in 2020-21 on Managing our energy legacy safely and responsibly Capital DEL is due to the Nuclear Liabilities Fund.

The large increase in spend in 2020-21 on Government as Shareholder Capital AME is due to the COVID-19 business support loans.

2019-20 outturn figures differ slightly between lines from those shown in the Statement of Parliamentary Supply as expenditure for Insolvency Service is shown here against Promote competitive markets and responsible business practices and for Financial Reporting Council against Promote competitive markets and responsible business practices (ALB) to reflect current Estimate structures, but was recorded against Government as Shareholder and Government as Shareholder (ALB) respectively in the 2019-20 Estimate.

Resource DEL expenditure for Nuclear Safeguards Development in 2017-18 was funded through a Contingencies Fund advance, pending passage of the Nuclear Safeguards Bill through Parliament. Repayment of that advance in 2018-19 was made against Capability DEL, offset by the credit shown against Nuclear Safeguards Development.

The receipt in 2018-19 against Managing our energy legacy safely and responsibly (CFER) Resource DEL relates to income from coal pension scheme surpluses.

The figures for Depreciation in Resource AME include the movement in fair value for Contracts for Difference, shown against Taking action on climate change and decarbonisation and Taking action on climate change and decarbonisation (ALB).

The large movements in take up of provisions within Resource AME in 2017-18 and 2018-19 is due to movements in the long term discount rate for provisions. This largely impacts the lines for Nuclear Decommissioning Authority and Managing our energy legacy safely and responsibly (ALB).

In their role as administrator of the Government’s GB Renewable Heat Incentive scheme, Ofgem made payments to scheme participants totalling £1,009,748,110.29 in the financial year 2022-23. Based on Ofgem’s sampling of the population and subject to our detailed assumptions, we can be 95% confident that the estimated value of error for GB Renewable Heat Incentive scheme payments made or accrued in the financial year 2022-23 is between the upper and lower limits of £9,256,397 and £5,078,679. Based on the same assumptions, the most likely estimated value of error for the same period is £7,167,538. This is 0.7% of scheme spend in 2022-23.

Table 2 - Administration budget, 2018-19 to 2022-23

2018‑19
Outturn
£’000
2019‑20
Outturn
£’000
2020‑21
Outturn
£’000
2021‑22
Outturn
£’000
2022‑23
Outturn
£’000
Resource DEL          
Promote competitive markets and responsible business practices 4,680 5,093 5,372 4,083 4,220
Science and Research - (2) - - 1
Capability 350,166 384,234 446,132 459,170 539,053
Promote competitive markets and responsible business practices (ALB) net 8,783 7,779 8,553 8,989 9,467
Taking action on climate change and decarbonisation (ALB) net 3,353 5,354 4,465 4,098 6,047
Managing our energy legacy safely and responsibly (ALB) net 6,912 4,833 5,112 4,485 2,816
Science and Research (ALB) net 5,547 7,410 7,120 6,182 4,011
Capability (ALB) net 30,475 34,693 11,103 12,379 14,576
Government as Shareholder (ALB) net 62 105 61 74 109
NDA and SLC expenditure (ALB) net 50,612 52,929 54,925 35,456 30,323
Total Administration Budget 460,590 502,428 542,843 534,916 610,623
Of which:          
– Staff costs 385,642 434,897 482,310 478,830 522,963
– Purchase of goods and services 177,288 162,338 167,999 193,797 238,556
– Income from sales of goods and services (10,220) (3,726) (3,092) (2,345) (3,353)
– Current grants to persons and non-profit bodies (net) 425 325 818 437 790
– Current grants abroad (net) 184 538 572 423 720
– Subsidies to public corporations 28 - - 4 2
– Net public service pensions (12) (13) (19) - -
– Rentals 22,485 33,391 35,883 324 163
– Depreciation 18,850 26,902 28,914 38,075 41,044
– Take up of provisions - 3 - - -
– Change in pension scheme liabilities 141 205 100 60 (6)
– Other resource (134,221) (152,432) (170,642) (174,689) (190,256)

Annex B: Financial information by ALB

The table below shows the total operating income, total operating expenditure, net expenditure for the year, and staff numbers and costs for each of our ALBs.

The figures below will not tie directly to the published ALB accounts as they include some adjustments which would have been captured in the ALB’s accounts in the previous year.

The staff costs and numbers for nuclear site licence companies (SLCs) are not included in the table below - as they are included in the amount shown for utilisation in the NDA’s nuclear decommissioning provision in note 20.

Financial Information by ALB

2022-23

Total Operating income
(£m)
Total Operating expenditure
(£m)
Net expenditure for the year (including financing)
(£m)
Permanently employed staff: Number of employees Permanently employed staff: Staff costs
(£m)
Other staff: Number of employees Other staff: Staff costs
(£m)
Core Department (348) 61,828 61,450 5,759 408 234 18
UK Space Agency (1) 650 648 259 17 2 5
Insolvency Service (60) 410 350 1,581 78 87 10
Companies House (89) 106 17 1,210 50 125 10
Competition Service - 5 5 21 3 - -
Diamond Light Source Ltd (104) 118 14 690 51 111 3
Financial Reporting Council Ltd (51) 51 - 418 39 - 1
UK SBS Ltd (48) 49 1 581 26 41 3
National Endowment for Science Technology and the Arts (3) 14 42 - - - -
United Kingdom Atomic Energy Authority (255) 261 (2) 1,704 113 603 36
ACAS (4) 62 58 921 47 53 -
BIS (Postal Services Act 2011) Company Limited - (1) (9) - - - -
Enrichment Holdings Limited - - (333) - - - -
BBB PLC (94) 176 145 562 52 - 4
Oil And Gas Authority (36) 36 - 195 19 4 -
Northern Powerhouse Investment Limited (1) 3 - - - - -
NDA (974) (103,758) (107,709) 360 47 52 4
Coal Authority (17) (3,371) (3,348) 319 19 13 1
Civil Nuclear Police Authority (134) 130 (4) 1,575 98 16 -
Radioactive Waste Management (106) 106 - 397 40 100 14
Electricity Settlements Company (686) 686 - - - - -
UK Climate Investments LLP (1) 4 - - - - -
Sellafield Limited - - - - - - -
Low Carbon Contracts Company 13,472 19 - 107 10 10 -
Midlands Engine Investments Limited (9) 2 - - - - -
UK Green Infrastructure Platform - - - - - - -
Cornwall and Isles of Scilly - - - - - - -
Salix (1) 11 10 125 6 4 -
Sizewell C - - - - - - -
UKRI (281) 9,571 9,282 7,035 482 1,595 39
Consolidation adjustments (12,862) (13,629) (27,046) - - - 1
Total Departmental Group (2,693) (46,461) (66,429) 23,819 1,605 3,050 149

Notes:

(i) Note that the UKRI figures do not contain intragroup UKRI eliminations, as these are shown within the total Consolidation Adjustments row.

Annex C: Glossary

ACAS: Advisory, Conciliation and Arbitration Service

AFP NI: Alternative Fuel Payment Northern Ireland

AGR: Advanced Gas-cooled Reactor

ALB: Arm’s-Length Bodies

AME: Annually Managed Expenditure

AQuA: Analytical Quality Assurance

ARAC: Audit and Risk Assurance Committee

ARG: Additional Restrictions Grants

BBB: British Business Bank Plc

BBLS: Bounce Bank Loan Scheme

BCSSS: British Coal Staff Superannuation Scheme

BEIS: Department for Business, Energy and Industrial Strategy

BNFL: British Nuclear Fuels Ltd

BVCA: British Venture Capital Association

CBILS: Coronavirus Business Interruption Loan Scheme

CARS: Coal Authority Restructuring Schemes

CCA: Climate Change Agreements

CCC: Climate Change Committee

CCUS: Carbon Capture Usage and Storage

CETV: Cash Equivalent Transfer Values

CFER: Consolidated Fund Extra Receipts

CfD: Contracts for Difference

CLBILS: Coronavirus Large Business Interruption Loan Scheme

CNPA: Civil Nuclear Police Authority

CNPP: Civil Nuclear Pension Plan CO: Cabinet Office

COVID-19: Coronavirus pandemic

CRC: Carbon Reduction Commitment

CSOPS: Civil Servant and Other Pension Scheme

CSP: Christmas Support Package

DA: Devolved Administration

DBT: Department for Business and Trade

DCMS: Department for Digital, Culture, Media & Sport

DDM: Dynamic Dispatch Model

DEL: Departmental Expenditure Limit

DESNZ: Department for Energy Security and Net Zero

DLUHC: Department for Levelling Up, Housing and Communities

DSIT: Department for Science, Innovation and Technology

EBRS: Energy Bill Relief Scheme

EBSS: Energy Bills Support Scheme

EBSS NI: Energy Bills Support Scheme Northern Ireland

ECL: Expected Credit Loss

EDI: Equality Diversity and Inclusion

EPG: Energy Price Guarantee

ESA: European Space Agency

ESC: Electricity Settlements Company

EU: European Union

EU ETS: EU Emissions Trading Scheme

EUV: Existing-Use Value

FCDO: Foreign Commonwealth and Development Office

FDP: Funded Decommissioning Programme

FF: Future Fund scheme

FIDeR: Financial Investment Decision Enabling for Renewables

FRA: Fraud Risk Assessment

FReM: Government Financial Reporting Manual

FVTOCI: fair value through other comprehensive income

FVTPL: fair value through profit or loss

GBN: Great British Nuclear

GDF: Geological Disposal Facility

GDP: Gross Domestic Product

GIAA: Government Internal Audit Agency

GID: Government Investment Decision

GGC: Greening Government Commitments

GHG: Green House Gas

GMPP: Government Major Projects Portfolio

GRAA: Government Resources and Accounts Act

GSG: Government Security Group

HMG: HM Government

HMT: HM Treasury

HPC: Hinkley Point C

IAS: International Accounting Standards

ICF: International Climate Fund

IETF: Industrial Energy Transformation Fund

IFRS: International Financial Reporting Standards

ILL: Institut Laue-Langevin

INSS: Insolvency Service

IPEV: International Private Equity and Venture Capital

IRIG: Integrated Review Implementation Group

ISPF: International Science Partnerships Fund

LADGF: Local Authority Discretionary Grant Fund

LCCC: Low Carbon Contracts Company Ltd

LCREE: Low Carbon and Renewable Energy Economy

LRSG: Local Restriction Support Grants

MOG: Machinery Of Government

MPM: Managing Public Money

MRC: Medical Research Council

NAO: National Audit Office

NATIS: National Investigation Service

NDA: Nuclear Decommissioning Authority

NDPB: non-departmental public bodies

NESTA: National Endowment for Science, Technology and the Arts

NIF: National Insurance Fund

NLF: Nuclear Liabilities Fund

NaLF: National Loans Fund

NNBG: NNB Generation Company (HPC) Limited

NNHL: National Nuclear Holdings Ltd

NSTA: North Sea Transition Authority

OCI: Other Comprehensive Income

ODA: Official Development Assistance

Ofgem: Office of Gas and Electricity Markets

OGA: Oil and Gas Authority

OHLG: Omicron Hospitality and Leisure Grant

ONS: Office for National Statistics

PCFP: Parliamentary Contributory Pension Fund

PCSPS: Principal Civil Service Pension Scheme

PDC: Public Dividend Capital

PES: Public Expenditure System

PIC: Projects and Investment Committee

PO: Partner Organisations

POL: Post Office Ltd

POPCO: People and Operations Committee

PPE: Property, Plant and Equipment

PSED: Public Sector Equality Duty

PSFA: Public Sector Fraud Authority

PV: Present Value

QA: Quality Assurance

R&D: Research and Development

RHLGF: Retail, Hospitality and Leisure Grant Fund

RLS: Recovery Loans Scheme

RPS: Redundancy Payment Services

RSL: Replacement Sea Line

SBGF: Small Business Grant Fund

SCS: Senior Civil Servant

SDG: Sustainable Development Goals

SI: Statutory Instrument

SLC: Site Licence Company

SME: Small and Medium sized Enterprise

SOCNE: Statement of Comprehensive Net Expenditure

SOFP: Statement of Financial Position

SOPS: Statement of Outturn against Parliamentary Supply

SOSIA: Secretary of State Investor Agreement

STFC: Science and Technology Facilities Council

TCA: Trade and Cooperation Agreement

TCD: Target Commissioning Date

TCW: Target Commissioning Window

TLM: Transmission Loss Multiplier

TME: Total Managed Expenditure

UKAEA: UK Atomic Energy Authority

UKRI: UK Research and Innovation

UKSA: UK Space Agency

UKSBS: UK Shared Business Services Ltd

VAT: Value-Added Tax

WTC: Waste Transfer Contract


Previous:
Trust statement