Impact assessment

Community Area collections for High Speed Rail (Crewe – Manchester) Environmental Statement

This collection includes the Volume 2 report and map book along with the Volume 5 technical appendices for each of the community areas for HS2 Phase 2b Crewe – Manchester.

Documents

MA01: Hough to Walley’s Green

MA02: Wimboldsley to Lostock Gralam

MA03: Pickmere to Agden and Hulseheath

MA04: Broomedge to Glazebrook

MA05: Risley to Bamfurlong

MA06: Hulseheath to Manchester Airport

MA07: Davenport Green to Ardwick

MA08: Manchester Piccadilly Station

Details

The High Speed Rail route between Crewe and Manchester is divided up into eight ‘community areas’ - MA01 to MA08. For each area, a Volume 2 report and a map book describing the likely significant environmental effects of HS2 Phase 2b Crewe – Manchester including:

  • an overview of the area;
  • a description of the construction and operational features of the Proposed Scheme within the area;
  • environmental baseline information;
  • a description of the likely significant environmental effects of the Proposed Scheme;
  • the proposed means to avoid, prevent or reduce the likely significant adverse environmental effects;
  • the proposals for monitoring, including measures during and post construction and during the operational phase; and
  • photomontages (viewpoints) that will be significantly affected.

These folders also include the Volume 5 (technical appendices and map books) related to the associated community area.

Updates to this page

Published 24 January 2022

Sign up for emails or print this page