SR2015 No 35: excavating a wetland or pond in a main river floodplain
Standard rules for excavating a wetland or pond in a main river floodplain.
Applies to England
Documents
Details
These rules allow you to create a wetland or pond in the floodplain of a main river as long as you remove all excavated material from the floodplain.
These rules do not allow you to excavate within:
- 8 metres of a flood defence
- 16 metres of a river
Updates to this page
Last updated 31 July 2019 + show all updates
-
Updated operational conditions and screening distances associated with each standard rule. The aim of this is to improve the uptake of flood risk standard rules permits.
-
First published.