SR2019 No 2: steps, ramps and other similar structures excavated into the existing bank profile of a main river
Standard rules for constructing steps ramps and other structures in to existing bank profile of main river.
Applies to England
Documents
Details
These rules allow you to construct steps, ramps and other similar structures excavated into the existing bank profile of a main river.
These rules do not allow the activity:
- on or within 8 metres of a flood defence
- during the fish breeding season