Skip to main content
Building regulation

Guidance and regulation

Skip to results
225 results sorted by Most viewed
  • This guide will help you understand the assessment criteria needed when you apply to register your business as a building control approver.

  • 2021 consultation-stage guidance for Approved Document L (conservation of fuel and power), Approved Document F (ventilation) and Overheating.

  • Divisional letter published 7 July 2008, about revised guidance on radon protective measures in new buildings, extensions.

  • Guidance on the government's plan for the removal of an unsafe cladding system on all buildings over 11 metres.

  • Find details of a building control approver listed on the register of building control approvers (RBCAs) for Wales.

  • This page provides links to guidance related to non-cladding remediation costs.

  • This guidance provides an overview of redress measures which ensure that those responsible for contributing to the building safety crisis meet the cost of rectifying their mistakes.

  • You have 28 days to challenge a listing after the notification has been published.

  • Building control performance standards and supporting guidance for building control bodies.

  • Divisional circular letter dated 13 January 1993, clarifying the Department of Environment circular 13/92 and Welsh circular 29/92.

  • Building Safety Fund for the remediation of fire risks associated with cladding in high rise buildings (England only): new applications from 28 July 2022.

  • This report gives guidance on sulfate-attack damage to houses from the past use of sulfate-bearing hardcore and infill material.

  • This guidance outlines the method of splitting costs in situations where the costs of remediation are greater than the total amount which can be passed onto to qualifying and non-qualifying leaseholders.

  • This page explains the Building Safety Regulator's procedure when investigating registered building inspectors, registered building control approvers and local authorities.

  • This glossary of terms has been created to aid leaseholders and residents to understand wording used in the Building Safety Fund guidance and Leaseholder and Resident Service.

  • A list of references to test standards that are common across a number of product families which apply to construction products.

  • This circular letter gives guidance to building control bodies on action to be taken when an initial notice lapses under regulation 17.

  • Changes to Section 30(A) of the Building Act 1984.

  • This page explains the Building Safety Regulator's inspection selection criteria and how it will prioritise the inspection of building control bodies.

  • Frequently asked questions following the ban on combustible materials in external walls.