Skip to main content
Road infrastructure

Research and statistics

Skip to results
185 results that are All research and statistics, sorted by Updated (newest)
  • These documents summarize the findings of the five years after evaluation study.

  • These documents summarize the findings of the five years after evaluation study.

  • These documents summarize the findings of the five years after evaluation study.

  • These documents summarize the findings of the five years after evaluation study.

  • Sets out work by the Strategic Transport Apprenticeship Taskforce in its first year and next steps for the taskforce and industry.

  • Statistics on estimates of vehicle compliance with speed limits on roads in Great Britain during 2016.

  • Statistics on road lengths in Great Britain for 2016.

  • Evaluation following the second year’s operation of the first smart motorway all lane running scheme, the M25 junction 23 to 27.

  • Evaluation following the second year’s operation of the first smart motorway all lane running scheme, the M25 junction 5 to 7.

  • Stage 3 of this strategic study focuses on alternative ways to relieve demands of the M25 south-west quadrant instead of widening the roads.

  • Sets out the findings of the Trans-Pennine tunnel strategic study.

  • Findings from the M60 north-west quadrant strategic study and reasons to consider further investment to the transport network in and around the area.

  • The stage 3 report on the Northern Trans-Pennine strategic study, which suggests how to improve the A66 and A69, to increase trans-Pennine connectivity.

  • Sets out the findings of the A1 East of England strategic study.

  • Explores the impact of bollard arrays on pedestrian flow through a series of trials that simulated evacuation conditions.

  • Year 1 interim report from a 3-year project to monitor the effect of increasing speed limits for HGVs over 7.5 tonnes in England and Wales.

  • Investigation into the benefits to transport from better data sharing, the case study took place in the Cambridgeshire A14 corridor.

  • Speed of traffic statistics in free flowing conditions on roads in Great Britain during 2015.

  • Statistics on road lengths in Great Britain for 2015.

  • This document summarises the findings of a one year after evaluation study.