Route-wide reports for High Speed Rail (Crewe – Manchester) Environmental Statement
These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe – Manchester on a route-wide basis.
Documents
Details
These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe – Manchester on a route-wide basis. ‘Volume 3’ of the Environmental Statement describes the likely significant environmental effects that are likely to occur at a geographical scale greater than the community areas described in Volume 2. The accompanying technical appendices (Volume 5) provide details of the studies and surveys undertaken at a route-wide level and are organised by environmental topic areas.
Route-wide reports document collection