Collection

Off-route reports for High Speed Rail (Crewe – Manchester) Environmental Statement

These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe – Manchester in areas not on the proposed line of route.

These reports present the likely significant environmental effects of the construction and operation of HS2 Phase 2b Crewe – Manchester on a route-wide basis. ‘Volume 3’ of the Environmental Statement describes the likely significant environmental effects that are likely to occur at a geographical scale greater than the community areas described in Volume 2. The accompanying technical appendices (Volume 5) provide details of the studies and surveys undertaken at a route-wide level and are organised by environmental topic areas.

Volume 4: Off-route effects

Volume 5: Off-route effects: Preston Station

These reports are the technical appendices (Volume 5) related to Preston Station.

Volume 5: Off-route effects: Carlisle Station

These reports are the technical appendices (Volume 5) related to Carlisle Station.

Volume 5: Off-route effects: Annandale Depot

These reports and map book are the technical appendices (Volume 5) related to Annandale Depot.

Updates to this page

Published 24 January 2022